Plugging god is our factory absorbs the advantages of similar products at home and abroad, and to improve and update, using a unique formula developed from the new generation of highly effective moisture-proof, impermeable multi-functional plugging material, is also an excellent bonding material, this product is a single group of gray powder.Its main technical index is higher than domestic similar product, reach international advanced level.It is characterized by fast setting and hardening, very short initial and final setting time interval, and rapid strength after final setting, with the strength greater than 10Mpa in 15 minutes and more than 20mpa in 1 hour.Can be local quickly with water plugging, and can be large area anti-seepage plastering, can take water operation, and quickly stop water plugging.The product is simple in construction, strong in adhesion with the basic level, no shrinkage, no fall off, can be widely used in houses, underground tunnels, mines and other projects to stop leakage, stop water, repair perfusion.The product is non-toxic, harmless, environmental protection products.
▲ scope of application
It can be widely used in all kinds of underground construction or structures, cable channels, pools, toilets, air defense caverns, subway tunnels and other projects to stop water leakage.It can also be used for emergency repair of urban underground pipelines and water pipelines and emergency repair and perfusion of equipment foundation.In addition, plug leak god also is the first choice material that stickup ceramic tile, Mosaic, marble wait for a block material, can make waterproof and stickup complete.
▲ construction method
1, the first cut to sew leaking or leaking point "∨" model, clutter at the grass-roots level to deal with clean and make the
foundation strong compaction.
2, will plug the god into the mixing bowl (bucket), add the right amount of water quickly mixing into slurry (add water more set time extension), the temperature is lower than 10 degrees, with warm water (40 degrees or so) quickly stir.
3, for slurry micro hot and slightly hard material into "∨" type slot or leaky seam, and compacted to a general water can be
blocked within minutes.
4, for the seepage pit, can directly plug the god dry powder into the pit, and then compaction, wipe, water conservation.
5. For severe water leakage cracks, drainage method is adopted to plug the seam first and then the seam.Finally, plug the drainage hole.
6, for large area of leakage, when necessary in the leakage of the serious part of the hole drainage, with slow coagulation
plugging god for large area treatment, and then plug god hole.
7. Finally, the factory can be used to slow coagulation plug the god face, and water conservation.