Enquiries
Message
Home > Products > Machinery > Refrigeration & Heat Exchange Equipment > Cold Room
refrigerator parts Timer delays, Thermostats,Delay on Break QD-068
  • refrigerator parts Timer delays, Thermostats,Delay on Break QD-068

refrigerator parts Timer delays, Thermostats,Delay on Break QD-068

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Textile Clothing Co.LTD
Meo Textile Clothing Co.LTD
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
shanghai,ningbo
Accepted Delivery Terms
Employees
101-200 people
Accepted Payment Currency
USD,CNY
Average Lead Time
60 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Condition:
New
Applicable Industries:
Other
Showroom Location:
None
Video outgoing-inspection:
Provided
Machinery Test Report:
Provided
Marketing Type:
New Product 2020
Place of Origin:
China
Type:
Refrigerator spare parts
Application:
Refrigerator
Warranty:
Unavailable
After Warranty Service:
No service
Local Service Location:
None
Certification:
ISO9001:2015
After-sales Service Provided:
No after-sales service
Supply Ability
Supply Ability:
800 Piece/Pieces per Day
Packaging & Delivery

QD-068  refrigerator parts Timer delays, Thermostats,Delay on Break

Installation:
1. Disconnect power
2. Connect terminals in series with thermostat&contactor as indicated in diagram
3. Circuits of 24V require no action. For 110V/240 applications, cut jumper wire as indicated at the bottom of the unit
4. Select the desired delay by turning knob adjustment from 2 sec. up to 600 sec.
5. Re-apply power


Specifications
* Input Voltage: 19-250VAC
* Frequency: 50/60HZ
* Time Delay: 2-600 sec. Adjustable
* Output Ratins: Max: 1.5 amps Min:40mA
* Inrush: 15 amps

Company Information

refrigerator parts Timer delays, Thermostats,Delay on Break QD-068 from China supplier 

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 20-25 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for charge and do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEric Zhang
Meo Textile Clothing Co.LTD
Enquire
Related Categories
CoolingTowerIceMachinesIndustrialAirConditionersIndustrialChillerRefrigeration&HeatExchangePartsUltra-lowtemperaturepreservationcabinet
Popular Searches
bifold doornoble doortoledo stoolcold room ukcold roomsalt roomgold sonamood condomsgold pom pomsholly rootcoir broomgold probecondo doorboard bookgold spoongolden hoodgold vodkacold cowold boltgolden condompolo bootsgold epoxysock loomsgold groutgold visorbold lockshard broompooja roomcold room doorgold visorgold condomsyard broomgold hogfood boothgold corollawood boomgold oboegold sofatoad venomroland motor