When applied to heat-exchange, install a pressure gauge at the outlet to ensure no blockage in the pipeline.
A strainer should be installed at the inlet to revent solids from being sucked in.
Install valves at the inlet and the outlet for easy maintenance.
Strainer mesh should be dia. 5~7mm and total mesh area is 5 times the pipe area or more.
1. Different chemical solutions mixed together will cause reaction and even heat to damage the pump. Don't pump different chemical solutions with the same pump.
2. Chemicals may cause serious injury. Keep away from dangerous area.
3. Before operating, please check the discharge and suction line and valvesrst. Make sure valves are all in correct position, then start. During operation, check discharge usually.
4. Incorrect operation, for example, valves closed, incompatible material and dry running may cause dangerous. Especially dry running, it will cause heat as well as vapor, even some chemical decomposes hydrogen and explode.
5. Start the pump and check the discharge from the outlet. If it is too low, unplug the pump immediately, and check the pipeline if there is any block..
6. The pump can be equipped with explosive-proof and pressure-proof motor.
Q1: What's your business range?
A: We manufacture Water quality analysis instruments and provide dosing pump, diaphragm pump, water pump, pressure instrument, flow meter, level meter and dosing system.
Q2: May I visit your factory?
A: Of course, our factory is located in Shanghai, welcome your arrival.
Q3: Why should I use Alibaba Trade Assurance orders?
A: Trade Assurance order is a guarantee to buyer by Alibaba,For after-sales, returns, claims etc.
Q4: Why choose us?
1. We have more than 10 years of industry experience in water treatment.
2. High quality products and competitive price.
3. We have professional business personnel and engineers to provide you with type selection assistance and technical support.
More information please send inquiry to us, we will provide the timely feedback!