3position Floating or modulating control motorized ball valves DN15-DN25
Our Motorized Ball Valve employs a patented design with equal percentage flow characterstics.
It is ideal for all flow control applications with chilled or hot water.
Applications
For high rise and commercial applications where higher closed-off pressure is required: fan coils, air handling units, etc.
Motorized ball valves with actuators conrol the flow of hot and chilled water through coils and heat exchangers.
Control Mode | 3-Point, Modulating |
Valve Body Material | Forged Bass Or Stainless Steel (DN15-50) |
Casting Iron (DN65-150) | |
Power Supply | 20Vac, 110Vac, 220Vac, 230Vac, 50/60Hz |
Connection | BSP Or NPSC (DN15-50) |
Flanged (DN65-150) |
l Bi-directional AC motor
l Apply to valves of DN15 to DN25
l Fire retardant engineering plastic, measure up UL94V-0 standard
l Integrate with on-off switch at the end of stroke for longer motor life
l With manual switch and position indicator
l Electrical on/off type or floating (PID adjusting) type
l Detachable design, easy to install and maintain
l Good heat insulation design to avoid overheating inside of actuator
l Reliable and high safety requirement level
l 0(2)~10V dc or 0(4)~20mA dc control input signal, proportional control.
l 0~10V feedback signal.
Related Item
Q1.Why choose us?
A:a,With 13years experiences in room thermostats and valves line.We are confidient about our products could satisfied customers.Quick delivery time, excellent quality and comprehensive superior service we can give our customers complete satisfaction.
b. 100% QC inspection before shipping.
Q2. What about the lead time?
A:Sampleneeds 3-5 days, mass production time needs 2-4 weeks.
Q3. Do you have any MOQlimit for thermostat?
A: 50pcs. 10pcs for samplechecking is available
Q4. How do you shipthe goods and how long does it take to arrive?
A: Samples we usually ship byDHL, UPS, FedEx, TNT.It usually takes 3-5 days to arrive.
Bulk orders,We generally choose airline and sea shipping is also optional.
Airline need 3-6 days and sea shipping need 20-35 days.
Q5 Payment
Acturally, payment would be preferred: Normally we choose in T/T, usually is 30% deposit and pay the balance before shipment.
Q6. How to proceed an order ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.