This product is widely used in many kinds of industrial factory, civilian buildings, and wall board for attached part product. It has advantage of pretty appearance, durable using and so on.
Uncoiler
Main forming machine
Hydraulic cutting
Electric system (PLC)
Hydraulic system
technical detail
Roller station |
18Steps |
Under Frame |
40mm-0.01~-0.03(with key-way) |
Shaft diameter(Solid) |
40mm-0.01~-0.03(with key-way) |
Shaft material(Hard) |
High grade 45# steel,heated and quenched,cylindrical grinding, |
Roller material(Hard) |
Cr12,heated and Quenched,polishing |
Bearing Type |
Standard |
Transmission Gear |
Heat treatment |
Motor Power |
5.5KW(Lichao,Shanghai) |
Forming Speed |
0-20m/min(Non-Stop) |
Main Structure |
Welded Structural Steel |
Hydraulic Cutting |
Tracking Length To Cut |
Pump power |
5.5 KW |
Hydraulic pressure |
20 Mpa |
Voltage Standard |
380V/3Phases/50Hz |
Cutting die |
Cr12Mov, Quenched processed |
High quality rollers will help to produce the beautiful and high quality profile. That will satisfy your customers.
Using high qualiy thick shaft, the strength is more durable.
The main body of the body without welding, all the use of cast steel, lead to the host body deformation.
PLC Control System
Usually we prodvide the Delta PLC control system, but we can make that according to your need.
metal stud and track used roll forming machine for sale/light gauge joist c u keel manufacturing
Uncoiling—Feeding—Roll forming—Cut to length—Cutting—Output table
In correct operation & maintaining, the machine is guaranteed for 18 months since leaving our
factory excludes the electric elements.
Installation:If installation is needed, we will dispatch a technician to the buyer’s factory abroad to assist
regulating the machine with charge. The buyer should assist the technician to get the Chinese technician's
visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the
buyer shall make the following preparation before arrival of technicians.
* Position the machine in the buyer’s factory.
* Prepare necessary electric wiring.
* Prepare material of trial running.
* Provide labors for assistance and installation during instalation.
A. Foreign commissioning
We will arrange our professional engineers to help you install and debug the machine well. Buyer should pay$100 for each engineer every day and responsible for transportation (including round-trip ticket), insurance, and suitable accommodation.
B. warranty period
1.The warranty will be maintenance, maintain in the guarantee period of 18months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts to charge freely, which is in the conditions of correct operation.
2.If the equipment are out of work in the guarantee period, the buyer need our repairman to go to buyer’s factory, the buyer should be responsible for the tickets(including round-trip ticket), the fee of transportation to the buyer’s factory andaccommodation. Required to change spare parts, the buyer should afford the freight fee and we don’t ask extra fee.
C. Training
During installation and adjustment of the equipment, our engineers are able to provide the training that
buyer’s personnel request to operate and maintain the equipment.
Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.
D. services
Lifetime services to every customer.
Welcome to contact and visit us.Waiting for your cooperation sincerely.