We can customize the completed Lead battery recycling plant
consisting of follow steps :
1. Battery breaking and separating
2. Paste desulfurization
3. Lead melting and reduction operation of paste
4. Melting of grid
5. Refining crude lead
6. Slag treatment
7. Plastic cleaning
8.Gas cleaning system
9. Acid neutralize and Effluent treatment
Name |
Capacity (KG/H) |
total power (KW) |
Separation efficiency |
Equipment dimensions (L*W*H)MM |
Lead battery recycling equipment |
1000-5000 |
≤80kw |
lead(%):≥ 95% |
24000*6000*5000 |
This process is an ECO-friendly method instead of pollution way that is based on burning and chemical processing.
1. Use battery auto cutter cutting the battery into 2 parts, make the acid liquid flow out.
2. Use the liqid-solid separation equipment to separate the lead paste,solid from liquid after Desulphurization , acid be neutralized by adding alkaline substance or produce to be sulfate crystallization.
3. Use intelligent crusher to crush the lead plate of lead battery into 1-2cm, crushed lead plate go to granulator by conveyor.
4. Use granulator with 45kw motor to cut the battery into 1-4mm granule. Crushed batteries are mixed with water becoming slurry.
5. Slurry goes to feeding silo via feeding slot.
6. The light material will float at the surface of water and go to deposit pool via Screw conveyor, the output from water pool is lead particular and lead power.
7. The heavy material will sink at the bottom of the feeding silo and then go to vibrating screen through Screw conveyor.
8. Gravity separator will classify the material by size and output lead granule. The water will be circulated and reused.
9. Dry the lead granules for melting
Q1:What is the physical address of your factory ?
A1:Xingou Industrial Park,Gongyi City,Zhengzhou City,Henan Province,China.
Q2:How to get to your factory ?
A2:You can fly to Beijing,Shanghai or Guangzhou airport,then transfer to Xinzheng International Airport,we will pick you up there.
Q3:How long it takes to drive to your factory from Xinzheng airport?
A3:2 hours
Q4:What is the Packing details ?
A4:Plywood case or Wooden case
Packing method can be also changed according to the clients' special requirement
Q5:Payment terms
A5:30% deposit by T/T,70% balance by T/T before shipment
30% deposit by TT,70% balance by L/C is also accepted if customers request