The copper wire stripping machine is used to crush and separate all kinds of automobile wires, communication cables and household wires and other industrial cables, and finally achieve the purpose of recycling copper. This machine is widely used in the waste processing field and designed to recycle 99% copper from waste wires, meanwhile it is environment friendly machine and no dust comes out during working.
FEATURES AT A GLANCE
dedusting equipment
crusher
Vibration bed
Feature : 1. The crusher adopts the roller type, low speed, high torque, large output, low noise and simple operation.
2. The sorting rate of air separation equipment is over 99%. 3. The crusher, sorting equipment and dust collecting equipment adopt platform combination. 4. The material returning system makes the semi-finished product undergo secondary pulverization, which ensures complete separation of metal and non-metal. 5. The bag dust collecting equipment effectively controls the dust overflow, and the dust removal efficiency is as high as 99% or more.
PRODUCT SPECIFICATIONS
Applicable scope(MM)
0.2-30
Size( L*W*H)(CM)
2600*1400*1800
Capacity(KG/H)
200-300 KGS/H
Power(KW)
22kw
large scrap copper wire cable granulator machine working principle
Firstly, the waste copper cable is roughly shredded by the shredder into about 10mm pieces, then the mixture will be delivered to the crusher to be crushed into 3-5mm particles in which process iron material is separated by magnet. And then the copper will be separated from PVC plastic by vibrating since things of different weight can be separated in vibrating. Finally, copper particles and plastic particles are collected respectively. To make sure the copper hair can be collected, the collected plastic particles are processed again through an electrostatic device.
PRODUCT CONFIGURATION
Application
Successful Project
SIMILAR PRODUCTS
Double shaft shredder machine
Plastic crusher
Double shaft shredder machine
FAQ
1.How many days do you need to produce this machine? This is specially designed machine according to your specific requirement. From engineer designing to production completion, It needs about 15-20 days.
2. What does your factory do regarding quality control? We pay much more importance to quality control from the very begining to the end of production. Every machine will be fully assembled and carefully tested before shipment.
3. What's your machine quality guarantee? Quality guarantee time is one year, we choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long will it take? Yes, we supply overseas service, but customer needs to pay for the engineers flight tickets and hotel foods.Small machine usually takes within 5 days.Big machine usually takes about 20 day.
No desirable products?
Sourcing assistant>
How to start your business
Step 1
Find your interested products by search keywords
Step 2
Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
Step 3
After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
Step 4
Set up meeting with the Chinese supplier without language barrier