PU foaming machine used for:
Advantage:
· portable compact design, can move everywhere easy.
· electricity driven guarantee more steady pressure and output.
· Energy saving 30% than others, only 6000w whole equiment
· high efficiency 6 kg output capacity per minute
· high pressure heat hose can up to 60meters long
· Convenient not need big air compressor added
Item |
FD-2F1 Polyurethane foam spray machine. |
Price term |
FOB QINGDAO USD |
Terms of Payment |
100% T/T in advance. |
MOQ |
1 set. |
Delivery time |
Within 20 days after receipt of your T/T payment. |
Warranty |
18 months. |
Standard configuration |
Proportion Fixed Mainframe 1 set |
Self-cleaning foaming gun 1 set |
|
Heating hose 49.2 feet (15m) |
|
Connecting hose from feeding pump to machine 10 feet(3m) |
|
Connecting hose from heating hose to gun 5 feet(1.5m) |
|
Rings and Tools |
|
Technical Data |
The ratio of raw material 1:1(Fixed) |
The viscosity range of raw material 200-1000CPS (Under the operate temperature) |
|
Max working pressure 13.8 MPa |
|
Max fluid temperature 88°C (190°F) |
|
Max output 6kg/min (13 lb/min) |
|
Heater power 1500W *2 |
|
Heating hose power 1000W/15m |
|
Whole power 6000W |
|
Voltage 230V/110V 1ph |
|
Operate temperature 0°C-70°C |
|
Clean mode Self-clean by air |
|
Max heating hose length 200feet (60m) |
|
Pneumatic source 0.1-0.4Mpa |
|
Packing size 800mm*700mm*1400mm |
|
Gross weight 220KG |
MAINFRAME
Q: what is warranty time ?
A: 18 months from you got the cargo.
During warranty time, we will supply the free parts by air in free,
after that date, we will supply spare parts in the base of part cost .
Q: what is delivery time / lead time ?
A: 20 days
Q: what is your minimum order ?
A: 1 pcs
Q: what is your payment term ?
A: 1- 30% down payment for order confirmation, 70% before shipment.
2- trade assurance
Q: can we visit your factory ?
A: yes you can at your free time.
APPLICATION SCOPE
CONNECTING HOSE
SPRAY GUN
SPARE PARTS FREE
Q: what is warranty time ?
A: 18 months from you got the cargo.
During warranty time, we will supply the free parts by air in free,
after that date, we will supply spare parts in the base of part cost .
Q: what is delivery time / lead time ?
A: 15 days
Q: what is your minimum order ?
A: 1 pcs
Q: what is your payment term ?
A: 1- 30% down payment for order confirmation, 70% before shipment.
2- 100% at sight LC
Q: can we visit your factory ?
A: yes you can at your free time.