Specification (mm) | Thickness(mm) | Package (pcs/bundle) | ||||||
S5 (1.25Mpa) for cold water | S4 (1.6Mpa) for cold water | S3.2 (2.0Mpa) for hot water | S2.5 (2.5Mpa) for hot water | |||||
20mm | 2.0 | 2.3 | 2.8 | 3.4 | 75 | |||
25mm | 2.3 | 2.8 | 3.5 | 4.2 | 50 | |||
32mm | 2.9 | 3.6 | 4.4 | 5.4 | 30 | |||
40mm | 3.7 | 4.5 | 5.5 | 6.7 | 20 | |||
50mm | 4.6 | 5.6 | 6.9 | 8.3 | 15 | |||
63mm | 5.8 | 7.1 | 8.6 | 10.5 | 10 | |||
75mm | 6.8 | 8.4 | 10.3 | 12.5 | 7 | |||
90mm | 8.2 | 10.1 | 12.3 | 15 | 5 | |||
110mm | 10 | 12.3 | 15.1 | 18.3 | 3 | |||
160mm | 14.6 | 17.9 | 21.9 | 26.6 | 1 |
Pipe outer diameter (mm) | Fusing Depth (mm) | Heating Time (s) | Inserting Time (s) | Cooling Time (s) |
20mm | 14mm | - | - | - |
25mm | 15mm | 7s | 4s | 2s |
32mm | 16.5mm | 8s | 6s | 4s |
40mm | 18mm | 12s | 6s | 4s |
50mm | 20mm | 18s | 6s | 4s |
63mm | 24mm | 24s | 8s | 6s |
75mm | 26mm | 30s | 10s | 8s |
90mm | 32mm | 40s | 10s | 8s |
110mm | 38.5mm | 50s | 15s | 10s |
160mm | 56mm | 80s | 20s | 15s |
1.Q: What information should I let you know if I want to get a quotation? A: (1) the size of products(Width x Height x Lenghth, Thickness). (2) the color. (3) the quantity.
2.Q: What is your terms of payment?
A: We accept T/T or L/C, and first 30% deposit by T/T, Western Uion, PayPal.
3.Q: What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
4.Q: What is your terms of packing?
A: Generally, we pack our goods in PE bags or Carton Boxes.
5.Q: How about your delivery time?
A: Generally, it will take 7 to 15 days after receiving your advance payment.
6.Q: Are sample free?
A: Sample if free of charge, and it's ready at any time. But the shipment charge need to be paid by your side, this fee will be rebound when we have formal order.
7.Q: Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We could further discuss on building the specific molds.
8.Q: Do you test all your goods before delivery?
A: Yes, we have a professional QC Team to execute the IQC, IPQC (Input Process Quality Control) and Final Inspection.