Curtain MBR
Description:
Brief introduction and Technical Specification
Curtain MBR Introduction
Membrane Bioreactor (MBR) is a new type of wastewater treatment technology that combines high-efficiency membrane separation technology with biochemical technology. The hollow fiber membrane module directly performs solid-liquid separation in the biochemical pool, replacing the secondary sedimentation tank in the activated sludge method, and effectively achieves the purpose of muddy water separation. The high-efficiency retention effect of the membrane allows the nitrifying bacteria to be completely retained in the bioreactor, so that the nitrification reaction can be smoothly carried out, the ammonia nitrogen can be effectively removed, the sludge can be avoided, and the macromolecular organic matter which is difficult to degrade can be retained at the same time, and the The residence time of the reactor is maximized. After applying MBR technology, the main pollution removal rate can reach: COD≥93%, the suspended solids and turbidity are close to zero, the water quality is good and stable, and it can be directly reused to realize the sewage resource.
Curtain MBR Advantages
1. High strength:
Reinforced composite PVDF hollow fiber membrane adopts unique support layer membrane technology, which makes its tensile strength and compressive strength much higher than ordinary hollow fiber membrane, and the single membrane filament tensile force is greater than 50KG. It is aptly called "pull continuous film".
2. Good anti-pollution performance:
Reinforced composite PVDF hollow fiber membrane adopts PVDF alloy formula as its filtration layer, and its ultra-smooth membrane surface characteristics and unique charge performance make it have strong anti-pollution performance.
3. Super-large flux:
The reinforced composite PVDF hollow fiber membrane adopts a relatively independent special support layer technology and PVDF alloy membrane filtration layer technology, and the formed filter layer has high porosity, and the produced membrane not only has high strength but also good flux.
4. Good retention performance:
The reinforced composite PVDF hollow fiber membrane adopts PVDF alloy membrane as the filtration layer, and its special inner and outer dense double skin structure makes it have excellent retention performance.
5. The cleaning flux recovery is good:
The reinforced composite PVDF hollow fiber membrane adopts PVDF alloy membrane as the filtration layer, and its special inner and outer dense double skin structure makes the pollutants only stay on the outer surface of the membrane and does not enter the membrane network. Inside the hole, it is very easy to clean and the cleaning flux is restored.
6. The reinforced composite PVDF membrane module can be modularized, compact in structure, small in footprint, and easy to use in combination.
7. Reinforced composite PVDF sewage treatment special diaphragm has a long service life, generally can reach 3-5 years.
8. The composite PVDF membrane has good chemical stability, acid and alkali resistance, bacterial corrosion resistance and good oxidation resistance.
9. The membrane module is provided with an aeration tube to wash the membrane wire with water and water to maintain the flux of the membrane. The surface of the membrane fiber can also be cleaned by the aeration process of the biochemical pool to maintain a stable water production.
Curtain MBR Performance Parameter
Specification | Model No. | HF-MBR-6-PVDF | HF-MBR-10-PVDF | HF-MBR-15-PVDF |
Membrane Area | 6m2 | 10m2 | 15m2 | |
Length | 1000mm | 1000mm | 1523mm | |
Width | 655mm | 655mm | 655mm | |
Thickness | 50 mm | 50 mm | 50 mm | |
Outlet | DN25 | DN25 | DN25 | |
Air Inlet | NA/DN25 | NA/DN25 | NA/DN25 | |
Weight | 6 kg | 10 kg | 15 kg | |
Fitting Material | ABS/UPVC | ABS/UPVC | ABS/UPVC | |
Parameter | Membrane Material | PVDF | PVDF | PVDF |
Intercepting Aperture | <0.2μm | <0.2μm | <0.2μm | |
Hollow Fiber Inner | 1.0mm | 1.0mm | 1.0mm | |
Hollow Fiber Outer | 2.4mm | 2.4mm | 2.4mm | |
Water Turbidity | < 1 NTU | < 1 NTU | < 1 NTU | |
Effluent suspended solids | < 1 mg/L | < 1 mg/L | < 1 mg/L | |
Life | 3-5 years | 3-5 years | 3-5 years | |
Packaging Material | PU/EPOXY | PU/EPOXY | PU/EPOXY | |
Process | Temperature Range | 1-45℃ | 1-45℃ | 1-45℃ |
PH Range | 2-13 | 2-13 | 2-13 | |
Water Production Flow | 2.0~3.0 m3/d | 3.5~5.0 m3/d | 5.0~7.5m3/d | |
Maximum Transmembrane Pressure Difference | -0.08 MPa | -0.08 MPa | -0.08 MPa | |
Outlet Way | Negative Pressure Suction | Negative Pressure Suction | Negative Pressure Suction | |
Running Way | Working 8min, Stop 2min | Working 8min, Stop 2min | Working 8min, Stop 2min | |
Chemical Sterilization Pharmacy | Sodium Hypochlorite | Sodium Hypochlorite | Sodium Hypochlorite | |
Chemical Cleaning Cycle | 6-12 months | 6-12 months | 6-12 months | |
Chemical Cleaning Pharmacy | Citric Acid/ Sodium Hypochlorite | Citric Acid/ Sodium Hypochlorite | Citric Acid/ Sodium Hypochlorite | |
Note: 1. The technical parameters and descriptions listed in the table are production standard values for reference. If there are special requirements, they can be adjusted accordingly; 2. The water production flow in the table refers to the design reference flux when the product is used for sewage treatment. |
Design reference for membrane mounting membrane stack of common MBR wastewater treatment project
Model No. | HF-MBR-50TPD | HF-MBR-100TPD | HF-MBR-150TPD |
Production Flux | 50-75 m3/day | 100-150 m3/day | 150-200 m3/day |
Quantity of the Unit | 22 units(10 square meter) | 30 units(15square meter) | 40 units(15square meter) |
Membrane Area | 220 m2 | 450 m2 | 600 m2 |
Outlet | DN32 | DN40 | DN50 |
Inlet | DN40 | DN50 | DN80 |
Length | 1800 mm | 2400 mm | 3000 mm |
Width | 760 mm | 760 mm | 760 mm |
Height | 1500 mm | 1900 mm | 1900 mm |
Weight | 200 kgs | 400 kgs | 550 kgs |
Recommended Aeration (Gas to Water Ratio) | >15:1 | >15:1 | >15:1 |
Frame Material | Stainless Steel Tube PVC Slot | Stainless Steel Tube PVC Slot | Stainless Steel Tube PVC Slot |
Note:
1. The membrane stack design in the table is designed with HF-MBR-10-PVDF or HF-MBR-15-PVDF membrane module as an example;
2. The size of the membrane stack in the table is the recommended value, which is adjusted according to the site conditions;
3. The water production in the table is the recommended value in the case of common sewage treatment. The user should adjust according to the actual situation of the sewage, such as COD value, sludge concentration MLSS value, aeration amount, etc.
Curtain MBR Module Pictures
Conditions and Methods of using
1. Membrane hydrophilicity and moisturizing
The reinforced composite PVDF membrane adopts hydrophilic modified PVDF raw material, and the membrane has good hydrophilicity, and no hydrophilic treatment is needed at the site. However, if the diaphragm is not put into use immediately after installation, or if it needs to be parked for a while during use, please ensure that the diaphragm is submerged in water or always wet.
2. Membrane flux maintenance and membrane cleaning
The aeration system of the diaphragm is constructed by using a perforated aeration method, and the bubbles and water flow generated by the aeration are fully shaken to achieve self-cleaning of the membrane. The intermittent operation mode is adopted, and the self-priming pump suctions for 10 to 12 minutes and stops for 2 to 3 minutes, which can effectively prevent the membrane pores from being clogged and ensure long-term and stable operation of membrane separation. When used for the first time, the biochemical pool microbial culture achieved good activity, and when the viscosity was small, the membrane began to be put into operation.
When the system is running, the constant flow method is adopted, and the suction negative pressure can be read by the electric contact type pressure gauge, and the initial diaphragm operation negative pressure is -0.01 to -0.03Mpa. When the conditions permit, the water can be siphoned, but the difference between the liquid level of the biochemical pool and the outlet pool should be 3.0-4.0 meters, the membrane is less likely to be polluted, the water is more stable, and the service period is longer. When the operating negative pressure exceeds -0.06 MPa, the diaphragm needs to be chemically cleaned in time. The cleaning method is to place the membrane stack in the chemical cleaning tank or the membrane module piece is removed from the membrane frame, rinse the surface of the membrane with clean water, remove the activated sludge attached to the surface of the membrane, and soak for several hours with a 0.5% NaClO solution. The bacteria adhering to the surface of the membrane are killed, the organic matter and the colloidal substance attached to the surface of the membrane are removed, and the membrane is washed with water, and the membrane flux can be recovered. If the salt in the water is more likely to scale on the surface of the membrane, it can be soaked with 2 to 3% hydrochloric acid for about 1 hour. Care should be taken in cleaning to prevent damage to the membrane.
3. Transportation and handling
The entire transportation process should ensure that the ambient temperature of the device is within the range of 5-40 °C to avoid damage to the diaphragm. And avoid exposing the device to sunlight, so as not to damage the engineering plastics on the device.
2. Product Show
Service:
1. Our Service
Welcome to your inquiry,you are promised to get our quotation within 24 hours
We are pleased to send you a sample on you confirm
We promise that we will implement your order on time
You are promised to get the best quality at the best price with the best service
2.FAQ
a.OEM service available for ro membrane?
Yes, OEM service is available, but the Green Filter brand price better than OEM
b.Payment Term
We can accept L/C, T/T, Western Union, MoneyGram
c.Certicification
We had passed ISO9001
d.Shipping
If your order is not big enough , Door to Door Service is the best choice via UPS,FEDEX,DHL,EMS.
For big quantity, by air or by sea through your forwarder is one Normal Way , we also can provide cost-effective forwarder for your reference.
e. Lead time
The normal lead time is 7-15 days, which depends on your quantity.