fruit and vegetable washing machine
Rolling drum with brush washing machine
Introduction
This equipment is composed of motor, water pump, roller drum, supporter, supporter wheel brush, water spraying tubes, feeding funnel, cover board, water box, valves transmission shaft, supporter for motor, electric control switches etc.
The fruits are washed by the brush and spouted spraying water in the rotating drum.
The water that comes out from the rotating drum can be recycled after filtered.
This machine is applicable for root vegetables.
Technical parameter
Model |
Description |
External dimension (L×W×H)(mm) |
Suggested capacity |
Suggested power |
capacity and power varies as to different fruits |
||||
TMQXJ-3 |
The material used is sus304 stainless steel, speed is adjustable, with water spraying device |
3000×1200×1850 |
≤3(T/H) |
3.3 |
TMQXJ-5 |
4000×1400×2000 |
3~5(T/H) |
3.3 |
|
TMQXJ-10 |
5000×1600×2500 |
6~10(T/H) |
5.2 |
|
TMQXJ-15 |
6000×1900×2800 |
11~15(T/H) |
6 |
|
TMQXJ-20 |
7200*1900*2800 |
15~20(T/H) |
7.4 |
Condition: New
Brand name: Shanghai Beyond;
Type: whole processing Line/turnkey project/fruit and vegetables processing/dairy processing/beverage processing
Voltage: 220v/380v
Power(W): 100-200kw
Weight: Different size different weight/customized
Dimension(L*W*H): Different size different dimension/customized
Certification: CE&ISO
Warranty: 12 months/1 year
After-sales Service Provided: Engineers available to service machinery overseas
Main material: SUS304 or SUS316
Control type: automatic, semi-automatic
energy consumption: Low consumption with high efficiency
capacity: 500-10000L/H-customized
installation period: 1-3months
Period time: 30 days-120 days
Cups material: pouches, paper box, glass bottle, pet bottle, glass bottle
Product storage condition: room temperature; low temperature;
packaging details: 1.the equipment will be first wrapped by plastic film
2.then we will make sainless steel supported with styrofoam on it under the equipments
3.lastly the equipment will be put in wood crates
Delivery time: 30-60 days
Engineer will be sent for the commissiong work and also be responsible for trainment of customer's workers.