Replaces: Freightliner 6803220301, 6803220105, 1615951000; Western Star 6803220301, 6803220150, 1617769000, 1615951000, Automann MR668, Atro SP46-52800, Dayton RB-211, Flagg RB211, Uro TD4640.
Penglai Tianri Polyurethane Co., Ltd. was established in 1992 with more than 400 employees, registered capital RMB20 million.
Penglai Tianri Polyurethane Co., Ltd. occupies more than 23,000 m2 with construction area more than 15,000 m2, have more than 400 employees, the annual production capacity of main products (polyurethane elastomer and compounds ) reaches 800 tons and the annual production capacity of torque rod can reach over 500,000 pcs.
Penglai Tianri Polyurethane Co., Ltd. is mainly engaged in torque rod and torque rod bushing, which have achieved international advanced level of like products. And our company is the supplier owning the most heavy truck companies of these supported products in China.
Penglai Tianri Polyurethane Co., Ltd, with more than 15 years experience in manufacturing torque rod and torque rod bushing, various kinds of products, flexible trial manufacture and production organization and quick response, we can provide the most convenient service to customers.
EQUIPMENT
* Plant: 23,000 square meters;
* 80 setsof processing equipment of modern PU elastomers;
* 160 sets of machining equipments;
* Production capacity of the PU elastomers: 800 tons;
* Trust rod more than 500, 000 pieces
CERTIFICATION
* 2012: QS 9000:1998 (SGS)
* 2004: ISO 9001:2000 (SGS)
* 2005: TS 16949 (SGS)
SPECIFICATION
1. Professional manufacturer for 15 years.
2. TS 16949 quality control system.
3.Customs made as per your sample and drawing.
SERVICES
PACKAGING&SHIPPING
Before Sale
1. Select the right model of equipment for customer
2. To meet our customer's special needs, we can design and develop
customized products.
3. Provide training for customer's technician.
4. We will send engineer to observe customer's working field to come up with an optimized solution.
During Sale
1. Inspect before accept the products sent by us.
2. Assist our customer to make a construction plan.
After Sale
1. The installation and testing of equipment.
2. Train the workers at present.
3. When the installation is finished, there will be one or two service engineer staying to ensure customer's production run well.
QUESTION
..We are a manufacturer with 20 years experience in developing, producing and selling.
..Generally T/T (30% deposit before production, and the balance against B/L copy)
..And L/C is available in long term cooperation.
..Yes, there is. But there is difference for different items.
..Yes. CAD or samples are all acceptable. Our team also offer design or reasonable suggestion for revision.
..Yes, but it's more expensive than mass production one.
More questions, please contact me by E-mail or the trade manager.