Compare categories | Plywood system | Aluminum formwork system |
Formwork specifications | diverse and disorderly | Serialization, dataization, standardization |
Load performance | 30KN/m2 | 60KN/m2 |
Early disassembly technology | No, 3 floor panel 3 floor prop | Yes, 1 floor panel 3 floor prop |
Construction period | 6 days/floor, no guarantee | 5 days/floor, Guaranteed(can be 4 days) |
Construction efficiency | 10-15 m2/day/worker | 15-30 m2/day/worker |
Number of cycles | 5-10 times (Lots of consumables) | 300 times (Very few consumables) |
Engineering Quality | Easy Explosive, plaster a lot | high verticality and flatness, no plastering |