Quality is our culture
polypropylenehdpe waterproofing geomembrane sheet pond liner
welcome to send me inquiry ,waiting for u at 24 hours
--- PRODUCT DESCRIPTION ---
Geomembrane is very low permeability synthetic membrane liner or barrier used with any geotechnical engineering related material so as to control fluid (or gas) migration in a human-made project, structure, or system.
Geomembranes are made from relatively thin continuous polymeric sheets, but they can also be made from the impregnation of geotextiles with asphalt, elastomer or polymer sprays, or as multilayered bitumen geocomposites. Continuous polymer sheet geomembranes are, by far, the most common.
No. |
Item |
Index |
||||||
|
Thickness/mm |
0.75 |
1 |
1.25 |
1.5 |
2 |
2.5 |
3 |
1 |
Density,g/cm3 |
≥0.95 |
||||||
2 |
Tensile yield strength,(MD/CMD)N/mm |
≥11 |
≥15 |
≥18 |
≥22 |
≥29 |
≥37 |
≥44 |
3 |
Tensile break strength,(MD/CMD)N/mm |
≥20 |
≥27 |
≥33 |
≥40 |
≥53 |
≥67 |
≥80 |
4 |
Yield elongation,(MD/CMD)% |
≥12 |
||||||
5 |
Break elongation,(MD/CMD)% |
≥700 |
||||||
6 |
Angle tear load,(MD/CMD)N |
≥93 |
≥120 |
≥160 |
≥190 |
≥250 |
≥315 |
≥315 |
7 |
Puncture resistence,N |
≥240 |
≥320 |
≥400 |
≥480 |
≥640 |
≥800 |
≥960 |
8 |
Stresscrack under tensile load(notch dead load tensile method),h |
- |
≥300 |
|||||
9 |
Carbon black content,% |
|
2.0-3.0 |
--- PRODUCT DISPLAY ---
--- PRODUCT APPLICATION ---
Geomembranes have been used in the following environmental, geotechnical, hydraulic, transportation, and private development applications:
--- RELATED PRODUCTS ---
Grid | Pond liner | Geotextile |
MORE >> | MORE >> | MORE >> |
--- ABOUT NUOLIAN ---
--- FAQ ---
Q:Are you trading company or factory?
A:We are factory for some main product, for other product we are trading company.
Q: How long is the delivery time?
A:Generally it is 2-3 days if the goods are in stock. Or 10-15if not in stock, according to the quantity.
Q:Do you provide samples?
A:Yes,samples are free.
Q:What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.