<1>Into bottle way is air conveyor direct connection with Bottle dial .
<2>All 304/316 stainless steel rinse heads, water spray style inject design, more save water consumption and more clean .
<3>304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing
<4> 304/316 stainless steel washing pump make the machine more durable .
<1> 304/316 Stainless steel high precision filling nozzle
<2> Filling volume adjustable in fine rank, same liquid level after filling
<3> All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean
<4> 304/316 stainless steel filling pump
<5>Efficient spray nozzle rinse thoroughly and save water for flushing
<1> Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping
<2> All 304/316 stainless steel construction
<3> No bottle no capping
<4> Automatic stop when lack of bottle
<5>Capping effect is stable and reliable ,Defective rate ≤0.2% .
Air conveyor is fixed on the floor, with fan installed on the top.
Air filter is positioned at every entrance of air fan, to prevent dust blown into bottles. Bottles are held on the neck in the conveyor and transported into filling machine by blowing power.
All are made of stainless steel SUS 304 /316.
Rack made by high quality carbon steel welded ,
1/Energy saving. High efficient. Adapt to customer factory layout
2/Special lubrication system, keep products clean, health, safety
3/Extended service life
4/Electric eyes design keep whole line running safety and quickly
5/Overload protection mechanism to effectively ensure the safety of the machine
1 High-shear emulsifying tank + Plate heat exchanger
2 Mixing tank
3 UHT sterilizer + homogenizer machine + Buffer tank
4 Hot water system + Hot water tank
5 CIP cleaning system
1 Raw water tank + Raw water pump
2 Silica sand filter + Active carbon filter + Sodium ion exchanger + Precision filter + Security filter
3 Reverse Osmosis (one level)
4 UV sterilizer
5 Finished water tank + Pure water pump
1/Stainless steel high pressure film shell
2/All kinds of capacity indicator, pressure indicator, electricity magnetic valve, balance device and pipe valve system
3/Online type pressure auto self-protection device
4/Online type electricity indicator (with stable compensation)
5/System safe protecting and alarm system
6/System frame
Full automatic blow molding machine is suitable for producing PET plastic containers and bottles in all shapes. It is widely used to produce the carbonated bottle, mineral water, pesticide bottle oil bottle cosmetics, wide-mouth bottle and hot fill bottle etc.
1/Use juice own high temperature to kill the bacterial inside cap.
2/Use juice own high temperature to improve sealing of bottle to extend warranty time.
3/Use SUS 304/316 stainless steel chain and high polymer material conveyor to keep high quality and increase service life.
1/Mainly for cooling and sterilization
2/The main parts of the machine are made of stainless steel, the top is designed to be openable for easy maintenance and observation
3/Nozzles are manufactured using U.S. technology and spray water evenly
4/Conveyor belt adopts Rexnor technology, flat surface with small wear
5/Smooth and reliable operation with low energy consumption
It adopts double driving structure which is a new and advanced driving device for the thermal shrink sleeve machine, that is, four-wheel driving, self-centering and balanced pressure of four wheels. It can achieve the good effect of transmission of labels smoothly, stably and rapidly.
Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine
PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.
<1> Standardized workshop of total 12,000 square meters.
Different types of processing units, such as water jet cutter, plasma cutter, laser cutter, CNC machine from Taiwan chevalier & korea daewoo, ensure the precision of parts.
<2>International certification, National Certificate of equipment verification, and more than 30 invention patents are done in King machine .
Verification Certificates of equipments: ISO9001:2001; CE Certificate , SGS , COC , TUV
National Certificate of equipment verification:standard organisation of Nigeria , CNCA certificate, Logo trademark registration, etc.
<3>The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
<4>Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
<5>The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers' requirements to save space.
<6>Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4. After sales
After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If the problems are still can not solve, we will arrange technician to your factory solving the problems.
Package Type : As usual, we adopt wooden case as package type. It's suitable for long-distance transport. According to customers' special demand, we could adopt sheet iron case and so on.
Transport : By sea.
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Our sales people you can get video of our reference running machine
Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!
Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
See King Machine How to ensure the Quality !
How to guarantee your funds to be safe and delivery to be on time?
Carbonated Drink Filling Machine
Glass Bottle Filling Machine