Enquiries
Message
Home > Products > Other
drain floor for  shower outdoor cleanroom
  • drain floor for  shower outdoor cleanroom

drain floor for shower outdoor cleanroom

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Warranty:
NONE
After-sale Service:
NONE
Project Solution Capability:
NONE
Place of Origin:
Taiwan
Brand Name:
OEM/ODM/Manufacture
Style:
Strainer
Product name:
drain floor for shower outdoor cleanroom
Key words1:
stainless cover bathroom basement floor drain
Key words2:
base anti odor toilet cover floor drain
Key words3:
kitchen with tile insert square floor drain
Material:
Stainles Steel
process:
Laser Cutting,bending
Surface treatment:
natural
Package:
Carton+pallet+Bubble wrap
Certification:
ISO9001,ISO14001
Function:
Bathroom Stainer
Packaging & Delivery
Product Detail

 

FAQ

 

 1.  Q: How are prices and customs fees calculated?

A: Will be adjusted according to the order quantity and product size

 

 2.  Q: Can it be made in small quantities?

          Can there be a large number of urgent orders  ?

A: Professional division of labor and adherence to a consistent production model is TAIWA’s greatest competitiveness. In addition, all standard operating procedures have passed ISO certification. It has first-class standards in quality and operation mode. Compared with other factories, it can produce more in emergency orders. It does not matter if it is 1 pcs or requires 10000pcs, it can be made. Customized sheet metal processing and proofing are also welcome.

 

  3. Q: Do I need to pay a deposit in advance?

A: When quoting, the price, freight and payment method will be informed first. Customers who cooperate for the first time will receive a 30% deposit.

 

  4. Q: How long does it take for sheet metal processing?

A: The evaluation of the delivery time will depend on the type of product you plan to produce and the completion of the graphic information. The more complete the product, the faster the production speed.

The best way is to email the drawing and production information to  and we can evaluate the delivery date based on your drawing.

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher