Model | GSL4500K | GSL4500S |
Inpot power | 250kw | 200kw |
Inpot speed | 1480 rpm/min | 1480 rpm/min |
Output speed | 21+46/-46/240 rpm/min | 9+2*22/-22 rpm/min |
Diameter(L*W*H)mm | 2240*2140*985 | 2240*2140*955 |
Our requirements:
1. All packing prepares product for shipment in a manner deemed to be safe, preventing damage or corrosion to product, and satisfying customer requirements.
2. Unpainted surface are to be coated or packaged to prevent corrosion or damage.
3. At a minimum, product will be skidded, blocked, and banded down or constrained in a manner to prevent shifting and undesirable movement in transit.
4. When blocking product it is required that all blocks/ supports be placed under stationary features and will not shift during transit. Straps/Chains from the truck should then be placed over those supports when applicable.
5. Konic Gearbox representative must verify that the load, chains/straps and tarp are assembled in such a way to avoid damage to the product during transit.
Don't hesitate to let us know your worry | ||||||
1. Are you a factory or trade company? | ||||||
We are the manufacturer,located in Yingchengzi Town of Dalian City, the north of China. | ||||||
2. What is your payment term? | ||||||
Negotiable depends on different situations.Usually 50% T/T prepayment , the balance should be paid before shipment. | ||||||
3. How long can you send your quotation to us? | ||||||
After got all the detailed information, we will quote within 2 work days. | ||||||
4. What is your quotation element? | ||||||
Drawing, material, weight, quantity and technical request. |