Enquiries
Message
Home > Products > Machinery > Refrigeration & Heat Exchange Equipment > Cold Room
cold storage mini room cooling room construction project cost
  • cold storage mini room cooling room construction project cost

cold storage mini room cooling room construction project cost

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Textile Clothing Co.LTD
Meo Textile Clothing Co.LTD
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
shanghai,ningbo
Accepted Delivery Terms
Employees
101-200 people
Accepted Payment Currency
USD,CNY
Average Lead Time
60 Day(s)
Certifications
Product Specifications
Model Number
Cold Storage
Product Description
Overview
Quick Details
Applicable Industries:
cold storage
Condition:
New
Temperature:
-10~+20'C
Place of Origin:
Henan, China
Brand Name:
canglong
Voltage:
220v
Power:
Energy Save
Dimension(L*W*H):
Customized Size
Weight:
500kg-20000kg
Warranty:
1 Year
Key Selling Points:
Sustainable
Compressor brand:
TECUMSEH
Panel Thickness:
100mm
Cooling Capacity:
25ton
Machinery Test Report:
Provided
Video outgoing-inspection:
Provided
Warranty of core components:
Not Available
Core Components:
Pressure vessel, Motor, Bearing, Gear, Gearbox, PLC, Pump, Engine
After-sales Service Provided:
Engineers available to service machinery overseas, Online support
Product name:
cold storage mini room construction project cost
Application Fields:
cold storage refrigeration unit
Name:
cold storage room
Steel beams:
H beams
Purlin:
C.Z Shape Steel Channel
Roofing:
Sandwich Panel. Single Steel Sheet
Surface treatment:
Hot Dip Galvanised
Color:
Customized Light Steel Structure House
Certificate:
ISO9001:2008/ISO14001:2004
After Warranty Service:
No service
Local Service Location:
Canada
Showroom Location:
Canada
Marketing Type:
New Product 2020
Certification:
ISO
Supply Ability
Supply Ability:
5000 Square Meter/Square Meters per Quarter cold storage mini room construction project cost
Packaging & Delivery
 

cold storage mini room construction project cost

Construction calss

(1)Simple Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than6m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet

Door

Wind resistance rolling door(within 10m2)

Window

Very few

Suitable market

No snow, wind load below 0.4kn/m2

 

(2)Standard Steel Construction  

Main structure

Single span: L -shorter than 24m, H -lower than8m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.5kn,wind loading below 0.5kn/m2

 

(3)Coastal(High Wind Speed)Steel Construction

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.7kn,wind loading below 1.2kn/m2

 

(4)Cold Region(Heavy Snow) Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

PU foamed rolling door

Window

Alu. Alloy (can use with skylight)

Suitable market

snow loads below 3kn, wind load below 1KN/M2

 

(5)Steel Construction  with Crane(5T,10T,15T,20T)

Main structure

Single span: L -shorter than 20m, H -lower than 10 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door (within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow 0.5kn, wind load below 0.5kn/m2

Steel Materials list

Bellow materials are general used in steel buildings , but we often customized each type depend on clients requirment .

Projects name :steel pokemon cards swimming pool cover from china

Item Name Materials Characteristics Material Grade Surface Treatment
Steel Column H shape,Box,Steel Pipe,Hot tolled sheet Q235B,Q345B Paint or Hot dip Galvanized
Steel beam H shape,Box,Steel Pipe,Hot tolled sheet Q235B,Q345B Paint or Hot dip Galvanized
Steel Bracing Steel Rod,Steel Pipe,Angle Steel Q235B,Q345B Paint or Hot dip Galvanized
Steel Purlin C or Z purlins(Thickness1.8mm~3.0mm) Q235B,Q345B Hot dip Galvanized
External Wall panels,Roof panels Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU. Galvanized Steel+Painting Alu-zin 150g,Fluorocarbon pain
Steel buildings Door Slidding or Rolling door Steel or Aluminum sheet Paint or Hot dip galvanized
Steel buildings Windows Aluminum alloy-Glass,Aluminum alloy-shutter T=1.0-2.0mm Alloy
Skylighting panels FRP T=1.5mm-1.8mm Coefficient of thermal expansion:2.2x10-5/cm Light Tranmitar 85%
Ventilator Turbine ventilator on a ridge Steel,Stainless steel ,PC Paint or Hot dip Galvanized
Gutter Galvanized steel plate,Stainless steel plate T=2.0mm Hot dip galvanized
Downpipe PVC pipe,color steelpipe Y=0.5mm Dia110mm paint
Hight Bolt Ordinary ,High strength 10.9S,4.8S Hot dip galvanized,Steel
Ground bolts Steel RodM24,M27,M30,M33,M39,M42 10.9S Steel
Steel&panels&sheets

steel structure frame and roof panels/wall panels/accessories almost like them:

 

Welded steel frame

Welded steel structure frame/warehouse/workshop/Prefabricated house/storage/Meatal shed must have strict process and good qulity , than it is safe and long life .

1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;

2. Reasonablly selection of welding parameters and order to prevent crack;

3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;

4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;

5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.

Attached: welding process parameters

welding process parameters

Materals(mm)

Electrode diameter  (mm)

Welding current(A)

Welding voltage(V)

Welding speed(m/min)

<10

Ø3.2

200-250

30-38

0.2-0.3

10-20

Ø4.0

200-250

30-38

0.15-0.25

>30

Ø4.0

320-350

30-38

0.3-0.5

 

Connected Detail

All steel structure warehouse,workshop ,storage ,steel prefabricated house , prefab home,prefab villas ,Steel Beams and Pillars connecteed Detail:

Steel Beams and Brace connected Detail:

Foundation Steel Ground bolts Detail :

 

Company Information

Who Are We ?

  We are a family owned business and have been in operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic 

 engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

 (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
 (2)Any problems that arise are quickly dealt with to minimise any delays. 
 (3)Safety on site is also made a priority.

 

Customers Visit

Steel structure warehouse,workshop,cold storage,Prebricated houses,frame houses,steel shed is our company main  products , they give high comments to our company qulity and service .

 

FAQ

1. Common type of the industrial steel structure building/Prefabricated house?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.

2. What's the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 20-25 days after the order confirmed, also depends on the order quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure or by Galvanized frame; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU sandwich panels.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no workteams , we can send our professtional teams to install for you.

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

8. Prefabricated warehosue/workshop/Prefab house/Storage Life :

 Reply : All steel structure frame life is more than 50 Years , all caldding sheets are about 20 Years .

 

   Welcome you to send inquiry to our company NOW ,we would like to supply best service for you !

   

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEric Zhang
Meo Textile Clothing Co.LTD
Enquire
Related Categories
IceMachinesIndustrialAirConditionersIndustrialChillerIndustrialHeaterRefrigeration&HeatExchangePartsUltra-lowtemperaturepreservationcabinet
Popular Searches
bifold doornoble doortoledo stoolcold room ukcold roomsalt roomgold sonamood condomsgold pom pomsholly rootcoir broomgold probecondo doorboard bookgold spoongolden hoodgold vodkacold cowold boltgolden condompolo bootsgold epoxysock loomsgold groutgold visorbold lockshard broompooja roomcold room doorgold visorgold condomsyard broomgold hogfood boothgold corollawood boomgold oboegold sofatoad venomroland motor