Q1. What's your main products? |
A:We can supply the window system (including profile, hardware, accessories, glass) as well as the finished products ready for installation.
|
Q2. What is your delivery time? |
A: Normally 25-30 days after receipt of deposit & drawing confirmed.
|
Q3. Are you supplying standard sizes of windows/doors or customised products? |
A1: Both is available.We have distributors in some maket,some of them are getting standard sizes of windows and doors from our factory. A2: And meanwhile, windows & doors are high customized products in many markets, the design,size/ materials or special requirements can be customized.
|
Q4. Do you have installation service or send installation team to job site? |
A1: Yes, we have installation company&teams. A2: Usually We offer the detail shop drawings & guidance service to overseas customer for installation, A3: and can send installation engineers to the construction site to do the installation instructions if required. A4: If it's the big project, we also can arrange the installation workers to do the installation service.
|
Q5. What are your payment terms? |
A1: Usually, our payment terms is T/T deposit in advance,the balance should be paid before delivery, A2: but if you want L/C or west union, we also can accept.
|
Q6. What's your sample policy? |
A: We can offer sample materials or sample windows for quality checking, but need to charge sample cost & freight fees. |