Enquiries
Message
Home > Products > Other
china shop bitumen free adhesive liquid adhesion chemicals concrete slab expansion joint filler
  • china shop bitumen free adhesive liquid adhesion chemicals concrete slab expansion joint filler

china shop bitumen free adhesive liquid adhesion chemicals concrete slab expansion joint filler

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
CAS No.:
9009-54-5
Other Names:
slab expansion joint filler
MF:
CH3H8N2O
EINECS No.:
210-898-8
Place of Origin:
CHINA
Classification:
Other Adhesives
Main Raw Material:
POLYURETHANE
Usage:
Construction, Transportation, paypal
Brand Name:
SEPNA
Model Number:
PU360
Type:
moisture curing
Product name:
concrete slab expansion joint filler
Color:
Grey
Material:
Polyurethane
Appearance:
Liquid
Feature:
Self-leveling
Function:
Sealing, Waterproofing, bonding,Repair
OEM:
offered
Samples:
provide
Shipping:
by express, by sea
Package:
20 PCS in one carton
Packaging & Delivery

  china shop bitumen free adhesive liquid adhesion chemicals concrete slab expansion joint filler

 

 

 

Product Description

 

One component polyurethane joint sealant is a durable elasticity moisture curing polyurethane polymer based road joint filling material. It is widely applied in filling road joints for the excellent properties and easy application.

Key Features

-1-component, no mixing

-Self-leveling, pourable

-Accelerated curing

-Extremely elastic

-High durability

-Resists aging, weathering

-Excellent adhesion

-Convenient, easy-to-use packaging

-Jet fuel resistant

Typical Applications

PU360 is used to seal horizontal expansion joints in concrete and cementitious slabs such as:

-Sidewalks
-Balconies
-Pavements
-Terraces
-Warehouses
-Factories
-Civil Structures
-Plazas
-Canals and Water Treatment

 

 

Technical Data Table

 

PROPERTY

STANDARD/UNITS

VALUE

Main raw material

-----

Polyurethane 

Appearance

Visual inspection

grey, liquid

Density

g/m3

1.35±0.1

Flow ability

mm

Self-leveling

Solid content

%

≥98

Surface dry time

hour

≤3

Tack free time

hour

6~16

Fully cured time

hour

≤24

Elastic recover rate

%

≥90

Elongation at break

%

≥800

Application temperature

°C

5~35

Service temperature

°C

-40~+80

Shelf life

month

9

 

 

l Application Points

1.Surface Preparation Clean all surfaces. Joint walls must be sound, clean,dry, frost-free, and free of oil and grease. Curing compound residues and any other foreign matter must be thoroughly removed. A mechanically roughened surface will also enhance bond.

2.For green concrete applications control joints must be cut 8 hours (min.) prior to sealant installation and expansion joint forms must be removed 4 hours (min.) prior to sealant installation.

3.For wet concrete applications all excess or standing water must be displaced and concrete must then dry for a minimum of 60 min prior to sealant installation. Install bond breaker tape or backer rod to prevent bond at base of joint.

4.Priming is not usually necessary. Substrates only require priming if testing indicates a need or where sealant will be subjected to water immersion after cure. Consult Sikaflex Primer Technical Data Sheet or Technical Service for additional information on priming.

l Application methods

1. Construction joint cutting: use the cutting machine to cut construction joint according to the designing and Programming, clean the dust and debris in the joint by the tools such as blower, brush and shovel knife. And make joint be dry completely

2. Backer rod installation: slightly install the polyethylene strip backer rod which the size should be larger than the construction joint, depth designed according to the application condition.

3. Application:

      Sausage Packing

      a.Clip the end of the sausage and place in barrel gun
      b.Screw end cap and nozzle on to barrel gun
      c.Using the trigger extrude the sealant with equal strength

4. Reserve gap: the construction joint will be expanding or contracting with the changing temperature, therefore, after application, the sealant should be installed lower than the concrete surface. 2-3mm in summer, 1-2mm in winter

5. Curing to tack free time, about 6 hours in summer ,12 hours in winter .

 

Attention of operation

1. The sealant should be guaranteed in the warranty period before application.

 2. This product non-toxic after curing completely, but before curing, please keep it away from eyes and  skin. If touch it with eyes and skin, wash immediately and thoroughly with soap and water. If feel uncomfortable, please go to hospital timely.

 

Packaging & Shipping

20kg/metal bucket, 230kg/Drum, 600ml/Sausage,20 pcs per carton

 

 Transportation: protect the products from stamp,rain,high temperature and heat souce;carefully and slightly move and forbid the products to squeeze and crash

 

 

Our Services 

 Products Limitation:

1. When overcoating with water, oil and rubber bassed paints, compatibility and adhesion testing is essential.

2.In joints subject to movement - maximum depth of sealant must not exceed 1/2 in.; minimum depth is 1/4 in.

3.Minimum depth of sealant for horizontal joints subject to traffic is 1/2 in.

4.Maximum expansion and contraction should not exceed 25% of average joint width.

5.Do not cure in the presence of curing silicone sealants.

6.Avoid contact with alcohol and other solvent cleaners during cure.

7.Do not apply when moisture-vapor transmission condition exists from the substrate as this can cause bubbling within the sealant.

8.Use opened packages in the same day.

9.The ultimate performance of our pu sealants depends on good joint design and proper application with joint surfaces properly prepared.

10.Do not use in contact with bituminous /asphaltic materials.

11.In green concrete applications sealing joints in poor or low strength concrete 24 hours after pour may impact abil-ity of sealant to gain proper adhesion.

12.In damp concrete applications all standing water and excess water must be eliminated prior to the 60 minute waiting time.

 

Company Information

 

 

FAQ

 

Q: What's your delivery time?

A:  Normally, the delivery time of sample order is 3-7days 

      Bulk order is 10 days after received the PO and deposit

Q: Can I get samples?

A: YES! Usually one piece 600ml Sausage or 1kg tin free sample supplied for your quality check.

 Three ways to get free samples below

 1. Supply us your import express account DHL/Fedex for sample shipping

 2. You can inform your DHL/Fedex to pick up the sample from Sepna factory.

 3. Pay express fee to Sepna company by Paypal or TT, we will arrange the sample delivery on our side.

 

Q: What is your MOQ?

A:  Our MOQ is 1000pcs 600ml Sausages.

 

Q: Can you do OEM lable for the products?

A: YES, the OEM service such as buyer labels are accepted as long as your order reach our standard amount.

 

 

Any more questions, please contact us anytime! 

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher