china shop bitumen free adhesive liquid adhesion chemicals concrete slab expansion joint filler
Product Description
One component polyurethane joint sealant is a durable elasticity moisture curing polyurethane polymer based road joint filling material. It is widely applied in filling road joints for the excellent properties and easy application.
Key Features
-1-component, no mixing
-Self-leveling, pourable
-Accelerated curing
-Extremely elastic
-High durability
-Resists aging, weathering
-Excellent adhesion
-Convenient, easy-to-use packaging
-Jet fuel resistant
Typical Applications
PU360 is used to seal horizontal expansion joints in concrete and cementitious slabs such as:
-Sidewalks
-Balconies
-Pavements
-Terraces
-Warehouses
-Factories
-Civil Structures
-Plazas
-Canals and Water Treatment
Technical Data Table
PROPERTY | STANDARD/UNITS | VALUE |
Main raw material | ----- | Polyurethane |
Appearance | Visual inspection | grey, liquid |
Density | g/m3 | 1.35±0.1 |
Flow ability | mm | Self-leveling |
Solid content | % | ≥98 |
Surface dry time | hour | ≤3 |
Tack free time | hour | 6~16 |
Fully cured time | hour | ≤24 |
Elastic recover rate | % | ≥90 |
Elongation at break | % | ≥800 |
Application temperature | °C | 5~35 |
Service temperature | °C | -40~+80 |
Shelf life | month | 9 |
l Application Points
1.Surface Preparation Clean all surfaces. Joint walls must be sound, clean,dry, frost-free, and free of oil and grease. Curing compound residues and any other foreign matter must be thoroughly removed. A mechanically roughened surface will also enhance bond.
2.For green concrete applications control joints must be cut 8 hours (min.) prior to sealant installation and expansion joint forms must be removed 4 hours (min.) prior to sealant installation.
3.For wet concrete applications all excess or standing water must be displaced and concrete must then dry for a minimum of 60 min prior to sealant installation. Install bond breaker tape or backer rod to prevent bond at base of joint.
4.Priming is not usually necessary. Substrates only require priming if testing indicates a need or where sealant will be subjected to water immersion after cure. Consult Sikaflex Primer Technical Data Sheet or Technical Service for additional information on priming.
l Application methods
1. Construction joint cutting: use the cutting machine to cut construction joint according to the designing and Programming, clean the dust and debris in the joint by the tools such as blower, brush and shovel knife. And make joint be dry completely
2. Backer rod installation: slightly install the polyethylene strip backer rod which the size should be larger than the construction joint, depth designed according to the application condition.
3. Application:
Sausage Packing
a.Clip the end of the sausage and place in barrel gun
b.Screw end cap and nozzle on to barrel gun
c.Using the trigger extrude the sealant with equal strength
4. Reserve gap: the construction joint will be expanding or contracting with the changing temperature, therefore, after application, the sealant should be installed lower than the concrete surface. 2-3mm in summer, 1-2mm in winter
5. Curing to tack free time, about 6 hours in summer ,12 hours in winter .
l Attention of operation
1. The sealant should be guaranteed in the warranty period before application.
2. This product non-toxic after curing completely, but before curing, please keep it away from eyes and skin. If touch it with eyes and skin, wash immediately and thoroughly with soap and water. If feel uncomfortable, please go to hospital timely.
Packaging & Shipping
20kg/metal bucket, 230kg/Drum, 600ml/Sausage,20 pcs per carton
Transportation: protect the products from stamp,rain,high temperature and heat souce;carefully and slightly move and forbid the products to squeeze and crash
Our Services
Products Limitation:
1. When overcoating with water, oil and rubber bassed paints, compatibility and adhesion testing is essential.
2.In joints subject to movement - maximum depth of sealant must not exceed 1/2 in.; minimum depth is 1/4 in.
3.Minimum depth of sealant for horizontal joints subject to traffic is 1/2 in.
4.Maximum expansion and contraction should not exceed 25% of average joint width.
5.Do not cure in the presence of curing silicone sealants.
6.Avoid contact with alcohol and other solvent cleaners during cure.
7.Do not apply when moisture-vapor transmission condition exists from the substrate as this can cause bubbling within the sealant.
8.Use opened packages in the same day.
9.The ultimate performance of our pu sealants depends on good joint design and proper application with joint surfaces properly prepared.
10.Do not use in contact with bituminous /asphaltic materials.
11.In green concrete applications sealing joints in poor or low strength concrete 24 hours after pour may impact abil-ity of sealant to gain proper adhesion.
12.In damp concrete applications all standing water and excess water must be eliminated prior to the 60 minute waiting time.
Company Information
FAQ
Q: What's your delivery time?
A: Normally, the delivery time of sample order is 3-7days
Bulk order is 10 days after received the PO and deposit
Q: Can I get samples?
A: YES! Usually one piece 600ml Sausage or 1kg tin free sample supplied for your quality check.
Three ways to get free samples below
1. Supply us your import express account DHL/Fedex for sample shipping
2. You can inform your DHL/Fedex to pick up the sample from Sepna factory.
3. Pay express fee to Sepna company by Paypal or TT, we will arrange the sample delivery on our side.
Q: What is your MOQ?
A: Our MOQ is 1000pcs 600ml Sausages.
Q: Can you do OEM lable for the products?
A: YES, the OEM service such as buyer labels are accepted as long as your order reach our standard amount.
Any more questions, please contact us anytime!