building project steel welded pipe 21mm to 219mm round erw 6 inch carbon steel pipe price per kg
Quick Details
Product Name:Welded steel pipe
Standard:ASTM, BS, DIN, GB, JIS
Grade:45#, 12Cr1MoV, 15MnV, 15Mo3, Q235, Q345, Q195, St37, ST35, STB35, STBA23, STPA23, A53(A,B), A269, A312
Thickness:0.5 - 20 mm
Section Shape:Round
Outer Diameter(Round):10 - 2000 mm
Place of Origin:Tianjin, China (Mainland)
Term:FOB/CIF/CFR
MOQ:10tons
Length:1-12m
Packing:usual seaworthy export packing
Surface:Black Painted
Shape:Round Square. Rectangular
Material:Q195/Q215/Q235/Q345
DN | A | B | C | ||||||
Outer diameter | Wall thickness | Outer diameter | Wall Thickness | Outer diameter | Wall Thickness | ||||
max | min | max | min | max | min | ||||
15 | 21.4 | 21.0 | 2.0 | 21.7 | 21.1 | 2.6 | 21.7 | 21.1 | 3.2 |
20 | 26.9 | 26.4 | 2.3 | 27.2 | 26.6 | 2.6 | 27.2 | 26.6 | 3.2 |
25 | 33.8 | 33.2 | 2.6 | 34.2 | 33.4 | 3.2 | 34.2 | 33.4 | 4.0 |
32 | 42.5 | 41.9 | 2.6 | 42.9 | 42.1 | 3.2 | 42.9 | 42.1 | 4.0 |
40 | 48.4 | 47.8 | 2.9 | 48.8 | 48.0 | 3.2 | 48.8 | 18.0 | 4.0 |
50 | 60.2 | 59.6 | 2.9 | 60.8 | 59.8 | 3.6 | 60.8 | 59.8 | 4.5 |
65 | 76.0 | 75.2 | 3.2 | 76.6 | 75.4 | 3.6 | 76.6 | 75.4 | 4.5 |
80 | 88.7 | 87.9 | 3.2 | 89.5 | 88.1 | 4.0 | 89.5 | 88.1 | 5.0 |
100 | 113.9 | 113.0 | 3.6 | 114.9 | 113.1 | 4.5 | 114.9 | 113.3 | 5.4 |
125 |
|
|
| 140.6 | 138.7 | 5.0 | 140.6 | 138.7 | 5.4 |
150 |
|
|
| 166.1 | 164.1 | 5.0 | 166.1 | 164.1 | 5.4 |
building project steel welded pipe 21mm to 219mm round erw 6 inch carbon steel pipe price per kg
Customer first, do the best product.we sincerely hope to establish good relations of cooperation, work together for green trade.
TF SOURECES CO.,LTD was founded in 2008 and is located in the famous industrial town of Daqiuzhuang industrial park. It is 150 kilometers from Tianjin port, and the company has a warehouse area of 10,000 square meters, which mainly manages steel products.
building project steel welded pipe 21mm to 219mm round erw 6 inch carbon steel pipe price per kg
1. How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
2. How to pay?
TT and L/C are acceptable and TT will be more appreciated.
3. What is the delivery time?
It depends on order quantity.Generally, the delivery time will be within 10 to 15 days.
4. What is steel quality?
We cooperate with Baosteel, Tewoo, Ansteel,and so on,some big goverment steel factory.
5. How to order from TF ?
Buyer Send Enquiry →Get TF Quotation → Order Confirmation
→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit
→ Strict Inspection during Production → Buyer Arrange Balance Payment
→ Packing → Delivery as per Trade Terms (FOB/CFR/CIF)