Bridge pier formwork system for precast concrete molds
Hanging plate formwork is a mold witch used in the construction of highways, bridges, high-speed rails, etc., to produce cement, concrete, prefabricated shutters. Because the shutter mold is large in size and long in length, therefore, the production of such large molds is made of steel templates. The process of making such a mold is also complicated, and there must be specific drawings provided by the customer. There are many pieces of debris involved. Only the shutter molds that are completely inspected according to the drawings can be used to produce qualified molds.
Therefore, the material requirements of the hanging plate formwork are also quite high, and the materials used are required to have the advantages of high density, hard hardness, high pressure, light weight, no deformation, clear lines, standard specifications, corrosion resistance and anti-aging. The mold to be produced should have a smooth surface and a high hardness. Requirement of raw material engineering polypropylene, sheet metal steel must pass the national level inspection, must be environmentally friendly zero pollution, the risk reaches the lowest.