asme b16.9 seamless butt weld carbon steel a105 swage concentric reducer price
1 |
Material: |
carbon steel (ASTM A234WPS, A234WPC, A420 WPL6), (ST45.8 A105 A106 STG42) Alloy steel(ASTM A234 WP12/WP11/WP22/WP5/WP9/WP91) Stainless steel(ASTM A403 WP304/WP304L/WP316/WP316L) |
2 |
Standard: |
ASME/ANSI B16.9, DIN2650,2615,2616,2617,JIS B2311, 2312,2313, EN 10253-11, EN10253-2, GB |
3 |
Size: |
1/2”~48” |
4 |
Thickness: |
SCH10,SCH20,SCH30,SCH STD, SCH40, SCH60,SCH XS, SCH80, SCH100, SCH120,SCH140,SCH160,SCH XXS |
5 |
Type: |
Elbow, tee, reducer, nipple, plug, union, bushing, cap, etc |
6 |
Surface: |
Transparent oil, rust-proof black oil, hot galvanized |
7 |
Weight: |
Heavy light, light weight |
8 |
MOQ: |
1 piece |
9 |
Packaging: |
1)Wooden case 2)Pallet 3)As per customer’s requirements |
10 |
Application: |
Oil, chemical industrial, water conservancy, electric power, boiler, machinery, metallurgy, etc |
1. How is your price?
A: Although we have brand-name products, our prices are very favorable and competitive.Because of our best price, customers from all over the world come to purchase our products.
2. How long is your warranty?
A: Our Warranty is 12 month.
3. Can I get free samples?
A: Yes, we can provide you the free samples, but you need to bear their own delivery costs.
4. Can I request to change the form of packaging and transportation?
A: Yes, We can change the form of the packaging and transportation according to your request, but you have to bear their own costs incurred during this period and the spreads.
5. Can I request to advance the shipment?
A: It should be depends on whether there is sufficient inventory in our warehouse.
6. Could you specially design and produce for clients?
A: Sure, we have all kinds of professional engineers.We can design and produce special products according to customers' request. Such as: special size, special control, OEM, etc.
7. What’s the MIDAS main market?
A: Our main market is African, Middle East Countries, South American, Asian.
8. What’s your payment?
1) 100% T/T
2) 30% in advance, others before shipment.
3) L/C