vegetable transplanter machine
A. Structural characteristics: The structure is simple, easy to use, and can be operated after being properly connected to the tractor. B. Convenient operation: column spacing, row spacing, random adjustment of the transplantation depth, compatible with a variety of crops and multi-purpose. C. Technical features: Rotary tillage, chemical fertilizer, pesticide, watering, transplanting, pressing soil, and dropper belt can be completed at one time according to needs.
D. Watering of seedlings: The transplanting and watering of seedlings can be carried out at the same time to ensure that the watering and watering at the same position are synchronized.Watering control realizes timing and quantification through electronic induction manuscript. Watering on demand can ensure the survival rate of seedlings. And save water.
Mode | 2ZBX-2F |
overall dimension(mm) | 2250*1970*1900 |
overall weight(kg) | 560kg |
supporting power(kw) | ≥50HP |
working row number | 2 |
Planting efficiency | 5000-8000 beads / h |
production efficiency(m/min) | >20 |
row spacing adjustment distance(mm) | 260~700 |
plant spacing adjustment distance(mm) | 200~600 |
Deep adjustment range(mm) | 50~150 |
Types of transplanted seedlings | Vegetable,corn,flower ect |
Seedling height(mm) | 100~250 |
Number of workers | 3 |
Why choose us as a vegetable seedling transplanter?
(1) ZWZG is an experienced vegetable transplanter manufacturer, our technicians have more than 10 years of experience in agricultural machinery manufacturing,
(2) We have good after-sales service. When you need our help, you can contact us at any time by email or online.
(3) Our products have high quality and competitive price.
(4) According to your planting requirements. From planting seedlings to harvesting, we will provide you with a full range of planting solutions.
About ZWZG
(1) ZWZG after-sales: one-year warranty, providing maintenance parts for life.
(2) ZWZG recommends ordering fragile parts to facilitate routine maintenance.
What is the delivery time of ZWZG?
15 days after receiving the prepayment
What is the payment term?
T / T 30% in advance, balance 70%.