Timber Beam Wall & Column Formwork
Timber Beam Wall Formwork
Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas' formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality.
The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used
to reinforce the corner
Timber Beam Column Formwork
Timber Beam Column Formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.
Adjustable column formwork
The adjustment of adjustable column formwork is realized by changing the steel waling relative position
1. Standard specifications
The steel waling of standard adjustable column formwork has three specifications. This can satisfy the need of concreting of column with side length from 200mm to 1200mm.
The length of steel waling(mm) | The side length of column(mm) |
1500 & 1800 | 800~1200 |
1500 & 1200 | 400~800 |
1200 & 900 | 200~400 |
When the steel waling are 1500 & 1200mm long, we can adjust the section dimension from 800x800mm to 400x400mm or any size column with side length from 400mm to 800mm, square or rectangle.
Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.
We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.
With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.
We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.
Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.
MORE+
Q1. What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 600 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.