the best choice for high rise buildings and bridges
1.Product Introduction
The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
2.Climbing Process
3.Major Components
Hydraulic Auto-climbing Formwork ZPM50
4.Platforms
5.Characteristics
1 | The formwork system can climb both vertically and slantwise fast. |
2 | The system can climb integrally or separately. The climbing process is steady, synchronous, and safe. |
3 | The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced. |
4 | The system will furnish all-round platforms and additional platform is not needed. |
5 | The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |
6.Parameters
PARAMETERS | |
Model | ZPM-50 |
Working Pressure of Hydraulic System | 50KN |
Number of Platform | 4~7 |
The largest allowable load of Operating Platform | 1.5KN/ m2 |
Height of Bracket | 10-15 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Weight | 1.3 ton/truss (Post Bracket) |
Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.
We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.
With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.
We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.
Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.
Q1. What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 600 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.