Designation of the pump: PUMPS
Manufacturer:Shanghai Shenbao Industrial Pump Co.,Ltd
No. of pumps:1
Liquid Handled: WATER
Rated capacity: max 1080m³/h
Total dynamic head at rated capacity :max 100m
Pump rated speed:2950r/min,1450r/min,980r/min
operating temperature:Max 2.5MPa
rotation:clockwise when look from the motor
Medium temperature:-10℃-120℃
ambient temperature:max 40℃
Type of pump casing: Horizontal end suction pump
Type of Impeller: Closed
Location: OUTDOOR
Pump suitable for parallel operation: YES
Pump No of stage: ONE
Bearing (D.E & N.D.E) Type of lubrication: Grease
Pump Casing:cast iron,ductile cast iron,cast steel,bronze alloy,stainless steel
Impeller: cast iron,ductile cast iron,cast steel,bronze alloy,stainless steel
Shaft: cast iron,ductile cast iron,cast steel,bronze alloy,stainless steel
Shaft sleeves: cast iron,ductile cast iron,cast steel,bronze alloy,stainless steel
Wear Ring:cast iron,ductile cast iron,cast steel,bronze alloy,stainless steel
Gland packing: PTFE / Grafoil
Gland plate: SS ASTM A 276 GR 316
Mechanical Seal:FLOW SERVE/EPIL/EQUI
PIPELINE CONNECTION
The water pipe should have its own supports in order to avoid all the weights depressing on the pump.
The pump line should be connected to the discharge nozzle by means of a flaring pipe with taper 1:7.
The average flowing velocity of water in the pipe is recommended not to exceed 2-3 m./s.
As for the suction pipe, the follows must be considered: the pipe must be as short as possible so as to reduce the resistance possible.The pipe must be bent according to prevailing regulation. It is not permitted to have too small bending curvature in order to avoid producing excessive losses.The connections of the pipes must be tight to prevent air from entering into the pipes.
When the pump position is higher than the water level, a foot valve should be installed at the bottom of the suction pipe or priming by a vacuum pump.
A gate valve and a non-return valve are installed between the discharge pipe and the pump. The inner diameters of the valves must not be smaller than the discharge pipe. The non-return valve is located on fro-side of the gate valve.
OPERATION
Inspecting the dates in the nameplate such as capacity, head, speed, and they must be accordance with the requirement.
The couplings shall be operating smoothly when rotating the pump by hands.
The starting task is to inspect whether the rotation direction of the motor corresponds to the requirement of the pump.
The valves, the pressure gauge on the discharge nozzle and the screwed plug on the vacuum gauge must be closed.
The pump shall is filled with liquid before starting. For pumps with a suction diameter equal to or less 300mm, the plug on the pump cover must be taken out and water is poured in through the plug hole on the top of the pump cover. For pumps with a suction diameter larger than 350mm, open the cock on the top of the pump cover and under the water indicator, and then start the vacuum pump. When the water level reaches the water indicator, clock the cock immediately.
Having done the procedure described above, start the motor and open the cock for a pressure gauge.
When the rated revolution of the pump is obtained and the pressure gauge shows a proper reading, open the cock for the vacuum gauge and the gate valve on the discharge pipeline gradually up to the required extent.
For stopping the pump, close the gate valve on the discharge pipe line gradually, close the cock for vacuum gauge, then stop the motor and close the cock for the pressure gauge.
Caution: when the ambient temperature is at 0℃ or below, the water remained in the pump must be drained off through the holes under the suction and discharge nozzles.
When the pump is to be out of use for a long time, it must be disassembled, cleaned and then packed for storage.
Quality Guarantee
One. Pre-sale service guarantee:
1. Help customers select the models of our products according to the technical requirement. .
2. Supply the necessary documents for your ordered products, including products introduce, performance parameter, installation dimension, installation debugging, matters need attention and so on.
Two. The sale of service guarantee:
1. As quality and quantity to supply the contract products on time.
2. As Fob price term , our company supply transport and quality insurance on the way for free in China.
3. As CIF price term, our company supply transport and quality insurance on the way for free from China to your sea ports.
Three. After service guarantee:
1.Quality guarantee : 12 month ;.
2.Within quality guarantee period, should the parts of pumps, motors, baseplates suffer damage which is not artificially caused, we will replace the unit immediately without charge.
3.If there is any problem during installation, our company will make installation plan no more than 2 hours after receiving your notice, and guide users to install and connect the pump units correctly.
4.Over the quality guarantee period : Our company is responsible for repairing, the cost of parts should be paid by user.
5.Our company will supply service after sale for whole day. If you call us when you have any problem, we will respond in 2 hours.
6.For the maintenance, if you need, our company will teach the person who appointed by you. We will appoint speical person to guide you during the maintenance peiod. During the quality guarantee period, our company will guide for the normal maintenance service, including all the check, adjusting and lubrication for the system. Also if you need, we can send our technical engeers to help you at site.
7.Our company will service for you periodically when you sue our products.
8.During using period, to make the products working very well, we will cooperate with you about products service.
Four. During for sale, on sale, after sale period, if you have any problem, our company will reply you or resolve it immediately.
fter sale service department in Shanghai head office:
Tel:86 021 6409 5555
Fax:86 021 6409 5040