Wholesale cheap angel steel cutting metal punching and shearing machine/ ironworker
Manufacturer cheap high quality metal punching and shearing machine
shearing and punching machine Widely used in high voltage switch cabinet, transformer substation, busbar, cable tray, electrical switches, communication equipment, household appliances, shipbuilding, office automation equipment, elevator manufacturing, cabinet manufacturing and other electrical equipment manufacturing industry. Bus processing machine is based on foreign advanced products, combined with the actual situation in China, in order to improve work efficiency and ensure the safety of the operation of the design of the supporting equipment. The most suitable for the production of large-scale electric control box and transmission and distribution engineering construction site.
Product parameters:
Model | YH-8 |
Burst pressure(Ton) | 110 |
Max plate thickness For shearing (mm) | 8mm |
The intensity of metal sheet(Newton/mm 2) | ≤450 |
Shearing angle | 45°/90° |
Dimension of Shearing plate for one time moving distance (T*W)(mm) | 25*330 ,16*600 |
Slider stroke (mm) | 36 |
Travel times (times/min) | 30 |
Depth of throat (mm) | 400 |
Punching thickness (mm) | 36mm |
Largest punching diameter (mm) | 22*8mm |
Main motor power (kw) | 2.2kw/2P |
Overall dimensions (length * width * height) (mm) | 950*500*1200mm |
Machine weight (kg) | 560kg |
We can manufacture all kinds of the machine .If you have any request, please contact us .
1.We have a good team for your service
2.We have strit quality control system
3.We will deliver as soon as possible once the orders
4,A large order will give the customer the best price
5,Products can be customized
1. Are you a factory or trading company?
We are the factory, which in this field for more than 20 years.
2. How should I do if meet some trouble while using?
We can supply English manual book and also take a video for showing how to resolve the problems or dispatch our worker to your factory.
3. What’s your MOQ ?
1 set.
4. How long can we get the goods?
we usually delivery in 3-5 working days, we will inform you shipping time based on your seaport.
5. What about Payment term?
T/T(Telegraphic Transfer ) --30% as prepayment by T/T, after seen the copy of the B/L sent by fax, the balance of 70% should be effected . Western Union ,L/C ,Trade Assurance,Etc.
6. How long is the guarantee?
we promise guarantee as one year for non-human damage factor.
7. How does your factory do regarding quality control?
Quality is priority. Our factory has gained ISO 9001 and CE authentication.