Brand | OUGE | ||||
Item | Wedding Pipe and Drape | ||||
OEM | Yes | ||||
Material | Aluminum | ||||
Size | Customized Size | ||||
Packing | In bag | ||||
Customize sample lead time | About 40~60 days | ||||
Stock sample lead time | About 2 days (Some products need 10days) | ||||
Port of loading | Guangzhou, Foshan, Shenzhen |
Item | Specification of pipe&drape | |||||
1pcs Fixed Pipe | ||||||
LG-106 | 3ft 1.5"/4 Pipe slots : H2.95ft DIA0.13ft | |||||
LG-108 | 10ft 1.5"/4 Pipe slots : H10ft DIA0.13ft | |||||
2pcs Extension-type LK | ||||||
LK-209 | 8ft-14ft/Outer Pipe:7.33ft/Inner Pipe:7.17ft | |||||
LK-211 | 12ft-20ft/Outer Pipe: 10.33ft/Inner Pipe: 10.17ft | |||||
2pcs Extension-type LZ | ||||||
LZ-251 | 3-5ft/Outer Pipe: 2.79ft/Inner Pipe: 2.05ft | |||||
LZ-252 | 4-7ft/Outer Pipe: 3.79ft/Inner Pipe: 3.05ft | |||||
LZ-253 | 5-8ft/Outer Pipe: 4.97ft/Inner Pipe: 4.04ft | |||||
LZ-254 | 6-10ft/Outer Pipe: 5.79ft/Inner Pipe: 5.04ft | |||||
LZ-255 | 7-12ft/Outer Pipe: 6.79ft/Inner Pipe: 6.04ft | |||||
LZ-256 | 8-14ft/Outer Pipe: 7.79ft/Inner Pipe: 7.05ft | |||||
LZ-257 | 9-16ft/Outer Pipe: 8.79ft/Inner Pipe: 8.03ft | |||||
LZ-258 | 10-18ft/Outer Pipe: 9.79ft/Inner Pipe: 9.04ft | |||||
LZ-259 | 11-20ft/Outer Pipe: 10.79ft/Inner Pipe: 10.04ft | |||||
LZ-260 | 12-22ft/Outer Pipe: 11.79ft/Inner Pipe: 11.04ft | |||||
LZ-261 | 13-24ft/Outer Pipe: 12.79ft/Inner Pipe: 12.04ft | |||||
LZ-262 | 14-26ft/Outer Pipe: 13.79ft/Inner Pipe: 13.04ft | |||||
3pcs Extension-type | ||||||
LZ-3275 | 5-11ft/Outer Pipe: 4.63ft/Inter Pipe: 4.27ft/Inner Pipe: 4.00ft | |||||
LZ-3276 | 6-14ft/Outer Pipe: 5.41ft/Inter Pipe: 5.15ft/Inner Pipe: 5.51ft | |||||
LZ-3277 | 7-17ft/Outer Pipe: 6.63ft/Inter Pipe: 6.25ft/Inner Pipe: 6.00ft | |||||
LZ-3278 | 8-20ft/Outer Pipe: 7.63ft/Inter Pipe: 7.25ft/Inner Pipe: 7.00ft | |||||
LZ-3279 | 9-23ft/Outer Pipe: 8.63ft/Inter Pipe: 8.25ft/Inner Pipe: 8.00ft | |||||
Drape Support Crossbar | ||||||
HL-401 | 4-7ft/Outer Pipe: 3.67ft/Inner Pipe: 3.70ft | |||||
HL-402 | 6-10ft/Outer Pipe: 5.68ft/Inner Pipe: 5.70ft | |||||
HL-403 | 7-12ft/Outer Pipe: 6.68ft/Inner Pipe: 6.70ft | |||||
HL-404 | 8-14ft/Outer Pipe: 7.66ft/Inner Pipe: 7.68ft | |||||
HL-405 | 10-18ft/Outer Pipe: 10ft/Inner Pipe: 10.02ft | |||||
Pipe and Drape Base Plate | ||||||
DZ-504 | 1.97ft/Weight: 29 pounds/With Hollow Pillar: 0.16*H0.50ft | |||||
DZ-505 | 1.33*1.17ft/Weight: 10 pounds/With Pins: H0.47ft DIA0.11ft | |||||
DZ-509 | 1.50*1.50ft/Weight: 33 pounds/With Pins: H0.50ft DIA0.16ft | |||||
DZ-515 | 1.50*1.50ft/Weight: 15 pounds/With Pins: H0.50ft DIA0.16ft |
* Can be assembled in minutes.
* Freestanding system.
* Virtually unlimited configuration.
* Creates different appearances.
* No extra tools required.
As a professional manufacturer and supplier of Europe and the United States crafts ornaments. We are specialized in producing home decoration and wedding supplies.Our company was established in 2012, a young and resilient company, has covered international areas for its product, quality and service.We provide silver plated qualified products for tableware such as knife , fork, spoon, etc.We are also specialized in home decorative items as Candelabra,Wedding Center Pieces, crystal centerpiece, candle stands, tea lights, Etc.The distinctiveness of our products, quality control management and efficient distribution system has contributed to rapid market penetration. We are constantly making efforts to not just meet but exceed our clients expectations by offering high quality products.We always offer valuable products and services to our customers.
Your inquiry related to
our products or prices
will be replied as fast
as we can, generally
in 24 hours.
Protection of your sales area,
ideas of design and all your
private information.
We provide best quality and competitive price.
Step 1: please tell us what model and quality you need;
Step 2: then we will make a PI for you to conform the order details;
Step 3: when we conform everything, can arrange the payment;
Step 4: finally we deliver the goods within the stipulate time.
Step 1: After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock.
Step 2: Before production has been finished,we will contact you for shipment details, and the balance payment.
Step 3: After payment has been settled, we start to prepare the shipment for you.
Step 1: Contect us at once with the damage degree of the product
Step 2: After we confirmed we can provide replacement in next shipment.
1.T/T (HSBC bank)
2.Paypal
3.Western Union
4.L/C
5.D/A
6.D/P
*The first three are the most usual ways we are using.