1.Plastic bag packed in bulk,then in carton with belts.
2.Or can do customized package based on customer' requirements.
1.DHL/FEDEX/UPS/TNT can be used based on small or middle package goods.
2.Air freight or sea transportation can be used based on big package goods.
3.Or can ship based on customer's forwarder to arrange.
A) Provide quotation within 12 working hours
B) 3D design drawing can be provided based on 2D drawing or sample
C) Our engineer will suggest technology and construction of the product.
D) Free sample will be provided after customer set up the mold before production
E) Fast production within 7 days based on MOQ, urgent orders can be arranged firstly
F) If goods has problem, we will reproduce for free after we confirm if we caused
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Generally speaking, the sample mold needs 7-10 days, the mass production mold needs 12 to 18 days.
If you have another question, pls feel free to contact us as below: