Paper product making machine circular economy egg tray packing machine
Whole production line include pulping system, egg tray forming system, egg tray packing system.Raw material is all kinds of waste paper, final product can be egg trays, egg cartons, egg box and so on. Dry system can choose it according to local conditions, we have natural sun dry, brick dryer line, metal dryer line, customer can choose it according to your budget.
Model | Capacity | Total Power |
Paper Consumption |
Water Consumption |
Electric Consumption |
Worker |
---|---|---|---|---|---|---|
ZT -1*3 | 1000 | 32 kw | 80 | 160 | 18 kw/h | 3-4 |
ZT-1*4 | 1500 | 40 kw | 120 | 240 | 32 kw/h | 3-4 |
ZT-3*4 | 2000 | 65 kw | 160 | 320 | 45 kw/h | 4-5 |
ZT-4*4 | 2500 | 82 kw | 200 | 400 | 58 kw/h | 4-5 |
ZT-3*8 | 3000 | 95 kw | 240 | 480 | 65 kw/h | 5-6 |
ZT-4*8 | 4000 | 112 kw | 320 | 640 | 78 kw/h | 3-4 |
ZT-5*8 | 5000 | 121 kw | 400 | 800 | 85 kw/h | 3-4 |
Packaging Details: Wooden or metal case according to specific size of each equipment,
we twine thick plastic coating for each machine
Delivery Detail:25 days after payment
1.What kinds of machines do you produce?
We produce :
(1)pulp moulding machines,egg tray machines,egg packing machines,egg box/cartonmachines, fruit tray machines,industrial machines,seeding tray machines .and thewhole production line etc.
(2)all kinds of moulds ,such as egg tray moulds,egg box/carton moulds, fruit tray moulds,seeding tray moulds,industrial moulds etc.
(3)drying line
2.What capacity per hour do you offer ?
Our machines' capacity is from 1000pcs/hr to 9000pcs/hr.
3.Do your products come with a warranty ?
Yes , we have one year warranty according the international practice.
4.Can I customize this kind of product from your factory?
Yes ,we offer custom-made service to our customers, you need to provide us some samples,such as photos,dimensions etc.
5.Can you give me a low price?
Yes,we are the manufacturer, at the same moment we guarantee the quality,we will give you a lower price.
6.How to install?
The seller dispatches engineers to buyer's factory. Buyer should help installation.Seller is responsible for installation, testing and training for 30 days, the buyer should insure the safety of the engineers.