HSSK-japan certificate passed W11S 3 roller plate rolling machine light industrial machinery
Export Standard Configuration
No. |
Item |
Remark |
1 |
Electric parts |
Schneider(France) |
2 |
Hydraulic parts |
YUKEN (Japan) |
3 |
Seals |
VALQUA(Japan) |
4 |
Forged Rolls |
NANGANG (China) |
5 |
PLC |
OMRON (Japan) |
6 |
Main Motor |
Siemens(Germany) |
7 |
Touch screen |
Touch win (Canada) |
8 |
valve |
Taiwan UOSHEN |
The Use of Plate Bending Machine
This Bending Machine is a symmetrical up-adjusting 3-roller Plate Bending Machine, which is used for bending the metal sheet with a certain thickness under normal temperature into cylinder-shaped, arc-shaped parts. And it is essential manufacturing equipment of chemical industry, cement, shipbuilding, boilers, water industry and other equipment production industries.
Diagram of Machine
No | Name | Unit | specification |
1 | Model | 8x2500 | |
2 | Max Rolling thickness | mm | 8 |
3 | Max Rolling width | mm | 2500 |
4 | Yielding Limit of Sheet | Mpa | 245 |
5 | Min Full Loading Diameter of Plate | mm | 380 |
6 | Diameter of Top Roller | mm | 180 |
7 | Diameter of Bottom Roller | mm | 160 |
8 | Central Distance between Bottom Rollers | mm | 220 |
9 | Rolling speed | m/min | 5.5 |
10 | Main motor | KW | 5.5 |
11 | Dimension(L x W x H) | mm | 4310x1050x1330 |
Remark:
Max pre-bending width of plate, Max plate thickness, min diameter of rolling plate at full roller and plate yielding limit, these four parameter items constitute the rolling machine maximum work ability parameter. If one of these four parameter items changes, the rolling machine coiling ability changes accordingly.
When the machine used as a pressing machine, for the base plate end pre-bending, the machine just have 60% capability of its max capability of rolling machine.
OUR SERVICE:
1. Warranty: 14 months after delivery the goods.
2. Payment: 30% down payment and 70% paid after receiving the copy of the
documents.
3. Delivery: 30 days after receiving 30% down payment.
4. Loading: Plastic cover coat, through containers
5. Technique support and service: support twice operating training, first one is
at my factory during the processing time, second one at the buyer’s factory during
the re-installation/testing period. We will send our engineers go to buyer’s
factory help to re-install this machine if customer required, and the customer need
to pay for heir flight tickets(go and back), room and board, local travel cost.