Chassis Model | ZZ4257N3246D1 |
Driving Type | 6x4 |
Engine | Make: SINOTRUK |
Diesel 4-stroke direct injection diesel engine | |
Engine model: WD615.47, 336 HP ;wd615.69,336hp; | |
Emission :Euro 2 | |
6-cylinder in-line with water cooling, turbo-charging and intercooling | |
Displacement: 9.726 L | |
Transmission | HW19710, 10F & 2R |
Steering | ZF power steering, modol ZF8118, hydraulic steering with power assitance |
Front Axle | HF7,1x7000 KGS |
Steering with doubleT-cross section beam | |
Rear Axle | ST16, 2x16000 KGS |
Pressed axle housing, central single reduction with hub reduction,with differential locks between wheels and axles. |
|
Ratio:4.11 | |
Tyres | 315/80R22.5, one spare tyre |
Fuel Tank | 400L |
Fifth Wheel | 90# |
Dimension | 6850*2496*3750mm |
Sinotruk & Chengda Group is a top 3 trailer and truck factory in China, which specialized in trailer and truck Manufacturing business for more than 15 years. We can supply you trailers, tankers, tractor trucks, dump trucks, etc. with competitive price and professional service.
1.Based on the customer's country roads situation, transport goods and loading weight requirment, provide semi-trailer solution.
2. Experienced sales and engineer support every requirment.
3. Customer’s design is available for certain products(OEM);
4. Spare parts for all types of semi-trailer with discount price.
5. From material to accessory parts, you can either choose or recommend a Chinese domestic customer with the best reaction quality.
6. Certificate of conformity for the semi-trailer.
7. English operation Manual.
8. Auxiliary parts of the semi-trailer.
1. What is your terms of shipment?
A: Generally, we ship our truck by ro-ro ship , bulk cargo vessel, container etc. spare parts are packed in wooden cases, shipped by containers
2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF
4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.