Very nice gentleman and his wife, we meet them in Shenzhen Hotel.
Item Name: Universal UNF/UNC Threaded HUB Double Split Shaft Collar with Black Coating
1. We are ODM&OEM, design according to your drawing.
2. Rich experience and good technology support ( with senior and professional engineers with more than 15 years experience).
3. We are factory, not trading company, so we can provide first-hand factory price.
4. Small/Low MOQ is accepted.
5. 100% inspection before delivery.
6. Competitive price with high quality.
7. Convenient transportation ( port: Shenzhen).
Product Name | Universal UNF/UNC Threaded HUB Double Split Shaft Collar with Black Coating |
Material | Aluminum/stainless steel/steel/cooper/brass/ABS/PEEK/POM.... |
Trade Terms | EXW,FOB,CIF,CFR etc |
Origin Country | Guangdong,China |
Lead Time | Sample: within 10 days. Mass Production: within 20-25 days after receiving the deposit Rush Services Available |
Package | *a. pp bags + carton + pallet *b. according to customers' requirements *c. negotiable |
Equipment List | From simple 2-axis turning to 7-axis, turn-mill-drill CNC Swiss-type machines, we are equipped with a full line of CNC equipment from the following manufactures: molding machines/ stamping machines automatic lathe machines/ spring machines. |
Service | *Punctual deivery *Reliable and cheap freight company *Good after-sale services |
Provide OEM/ODM service and assembling service, since 2000
One-stop service and sample support.
Save on cost by optimizing product design and material slection.
Our Workshop
Our Warehouse
Our Team
Packing Details :
*a. pp bags + carton + pallet
*b. according to customers' requirementsDelivery Details : Sample: within 10 days.
Mass Production: within 20-25 days after receiving the depositISO,ROHS,HE,IATF,TS16949..
Very nice gentleman and his wife, we meet them in Shenzhen Hotel.
Customer visit our factory and taken potho with our sales and boss.
Customer visit our factory and taken potho with our sales and boss.
A: We are factory.
A: In 15-25 days after get the deposit (including tooling making time).
A: 1. T/T: 30% Deposit,70% left amount before shipment
2. L/C; irrevocable 100% L/C at sight.A: * You send us drawing or sample
* We carry through project assessment