Toughened tempered fluid reflex flat level indicator sight glass
Product Name |
Gauge Glass, Reflex Gauge Glass, Sight glass, level Gauge glass |
Material |
Aluminosilicate glass, Borosilicate glass |
Color |
Transparent, Red, Green |
Density |
2.62-2.67g/cm3 |
Transmissivity |
91.8%(8mm),91.9%(1mm) |
Hardness |
>7 |
Tensile strength |
4.8x107pa(N/M2) |
Compressive strength |
(0-300) 3.3±0.1×10-6K-1 |
Poisson's ratio |
0.18 |
Coefficient of thermal expansion |
(0-300) 4±0.1×10-6K-1 |
Thermal conductivity |
1.2W·m-1·k-1 |
Softening point |
820±10°C |
Annealing point |
560°C |
Strain point |
516±10°C |
Electrical resistivity |
>1018 Ωm |
Dielectric constant |
4.6 1 MHz, 25 |
Size |
Width: 25-35 mm. Length: 70-400 mm. Thickness: 15-25 mm. |
Advantage |
1. More than 15 years experiences on glass manufacturing and exporting 2.Top quality glass with CE certificate, exporting to more 60 countries in the world 3.Unique designed strong wooden cases , solving the problem of breakage 4.Professional sales team, Personalized and focused service available 24 hours. |
Feature 1.Resistance to high temperature of 400°C. 2.Light transmittance 93%. 3.Boiler use,Acid and alkali resistant to corrosion. |
Why Choose US
Q: Are you a manufacturing or trading company?
A: We are a glass manufacturing company.
Q: Can you do customized design and size samples?
A: Yes, we could do customized sample based on your design.
Q: How to receive a price quotation in the shortest time?
A: When you send us an enquiry, please kindly make sure all the details such as size, product capacity, logo requirements and order quantity. If you have the drawing, please feel free to send us.
Q: Can I have some samples before mass production?A: Sure. In order to make sure the best quality and meet your requirement, we will make final samples for your approval.
Q: How long is your sample lead time and production lead time?
A: Customized samples: 5-7 days after artwork confirmed. Production lead time: 20-30 days after samples confirmed.
Q: What’s your payment term?
A: For sample order, we prefer 100% payment before production. For mass production order, 30% deposit and 70% balance before delivery.