≥40
Inch size
| MM O.D (mm) | Labial ministry diameter(mm) | Main body diameter(mm) | Bore diameter(mm)
| Length (mm) | |||
Rubber | Polyurethane | Rubber | Polyurethane | Rubber | Polyurethane | |||
101 | 101~104 | 96~99 | 94~97 | 89~92 | 77~80 | 72~75 | ≥40 | 100~190 |
114 | 114~116 | 109~111 | 108~110 | 102~105 | 80~83 | 75~78 | ||
127 | 127~130 | 122~125 | 120~123 | 115~118 | 90~93 | 87~90 | ≥50 | 120~210 |
140 | 140~145 | 135~140 | 130~ 135 | 125~130 | 100~103 | 97~100 | ||
178 | 178~183 | 173~175 | 168~173 | 163~168 | 130~135 | 125~130 | ≥70 | 150~240 |
194 | 194~201 | 189~196 | 182~189 | 177~184 | 145~150 | 140~145 | ||
219 | 219~223 | 214~218 | 210~214 | 205~209 | 168~173 | 163~168 | 180~260 | |
244 | 244~249 | 239~243 | 234~239 | 229~234 | 192~197 | 187~192 | ||
273 | 273~279 | 268~273 | 262~268 | 257~263 | 210~214 | 205~209 | 220~300 | |
298 | 298~305 | 293~297 | 286~293 | 281~288 | 236~243 | 231~238 | ||
340 | 340~348 | 335~343 | 326~334 | 321~329 | 264~272 | 259~267 | 260~350 | |
508 | 508~519 | 503~514 | 490~501 | 485~496 | 424~435 | 419~430 | ≥100 | 360~450 |
Pu yang sanli integrity oil equipment Co,Ltd was founded in 2010.The factory covers an area of 40000 square meters.It is a large scale developent enterprise that has integrated technical research,product desin,manufacturing,market and after-sale services.
The company is mainly engaged in the development, production, promotion and application of drilling & oil producing equipment and its accessories, drilling & oil producing chemical auxiliaries, solid control equipment, and cementing tools.With advanced and reliable products and services,we are committed to creating values to our clients.
The company has passed the ISO9001 international quality system certification. And cementing accessories have passed the international API certification.
1) How can I place order?
A: You can contact us by email about your order details.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T , L/C and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production.
After we get the deposit, we start to process the order.
We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Main products