Electric heating boiler is a kind of safe and high efficiency (99%) heating equipment, it has the characteristics of long working life, small occupation, environmental protection, and operate automatically and quietly. The electric heating boiler are full automatic controlled, operate safely and conveniently. All the electrical components have the CE and CCC certification, the high quality cartridge heaters could works for about 20000 hours. Electric heating boiler is very popular in Ethiopia, India, etc.
The electric steam boiler can be used for the steam required for the processing of industrial products such as textile, printing and dyeing, paper, food, rubber, plastics, chemicals, medicine, steel, metallurgy, etc., and can be used for enterprises, institutions, hotels, schools, restaurants, services, etc. Industry heating, bathing, air conditioning and domestic hot water.
Characteristics of Electric Heating Steam Boiler
1. Steam capacity of type boiler: 100~2000kg/h
2. All the electrical components have the CE and CCC certification
3. Cartridge Heaters can work for about 20000 hours
4. PLC full automatic intelligent control cabinet, operate conveniently.
5. Full automatic interlock protection program, operate safely.
6. Reliable boiler auxiliaries, i.e. pressure controller, pressure transmitter, water level alarm, safety valve, etc.
7. Large steam space, high steam quality.
8. Environmental protection.
9. Small occupation, save construction investment.
Model |
Rated Capacity (t/h) |
Rated Pressure (Mpa) |
Rated Steam Temperature (℃) |
Thermal Efficiency (%) |
Overall dimension (m) |
Weight (kg) |
LDR0.2-0.4 |
0.2 |
0.4 |
151 |
99 |
1.0×2.5 |
750 |
LDR0.3-0.4 |
0.3 |
0.4 |
151 |
99 |
1.1×2.6 |
920 |
LDR0.4-0.4 |
0.4 |
0.4 |
151 |
99 |
1.2×3.0 |
1100 |
LDR0.5-0.4/0.7 |
0.5 |
0.4/0.7 |
151/170 |
99 |
1.2×3.2 |
1350 |
LDR0.7-0.4/0.7 |
0.7 |
0.4/0.7 |
151/170 |
99 |
1.3×3.5 |
1800 |
WDR1-0.7 |
1 |
0.7 |
170 |
99 |
3.0×1.4×1.65 |
2100 |
WDR1.5-0.7 |
1.5 |
0.7 |
170 |
99 |
3.5×1.6×1.75 |
2600 |
WDR2-0.7 |
2 |
0.7 |
170 |
99 |
4.0×1.7×1.95 |
3100 |
Note: 1.Parameter is for reference only, if any changes should follow actual drawings. 2. Here are parts of boiler products, please inquire for the specific details. |
Project Site: Ethiopia
Steam Capacity: 2 ton/h
Steam Pressure: 1.0 Mpa
Application: University Canteen |
|
Project Site: South Africa
Steam Capacity: 4 ton/h
Steam Pressure: 1.25 Mpa
Application: Mining Industry |
|
Project Site: Ethiopia
Steam Capacity: 4 ton/h
Steam Pressure: 1.6 Mpa
Application: Ceramics Factory |
|
Project Site: Ethiopia
Boiler Capacity: 2 ton/h
Boiler Pressure: 1.0 Mpa
Application: Cement Plant |
We have professional engineers service team. According to the customers’ requirement and site specific condition, they can make the suitable and optimal solution about the after-sales service. Moreover, Xinli Boiler set up sales and after sale facilitating agencies around over 30 regions, to offer the high quality services.
1). 24hours service hotline.
2). 24 months warranty after delivery.
3). Spare parts are equipped during shipment.
4). Provide instllation, commissioning and maintance service anytime.
FAQ:
Q1: How to get the best price quickly?
1) Please offer the boiler capacity & pressure you need, and the fuel you plan to use, then we could offer the suitable boiler model.
2) Please provide your name, email address, WhatsApp/WeChat/Skype, and company name, then we will send the best price and boiler details immediately.
Q2: How to ensure the boiler quality?
(1)Strength calculation report for applied materials information;
(2)100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3)100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4)Hydrostatic test: ensure the standard working pressure and safety;
(5)Third-party inspection report: Henan Boiler Inspection Institute;
(6)Passed ISO:9001,CE, SGS and Intertek certificate.
Q3: What about the installation and Commissioning?
After you receive the boiler, we will guide you to make some preparation for installation, and our experts will offer overseas installation service if you need, and fly to the installation site within 72 hours.
Q4:What is the using life of your boiler?
Normally the boiler is designed for 15 years life span, but with correct operation and well maintenance, the boiler operation life will be longer.
Q5: After Sales Service
1) Guarantee Period:12 months from the date of trial run finish, but not to exceed 18 months from date on which the goods leave factory.
2) If any parts (excluding easily damaging parts) are found defective in quality in the first year, we will replace free-of-cost.