Place of Origin | Tianjin China (Mainland) | ||||||||
Size | more customized size available) | ||||||||
Length (mm) | 1000mm | 1500mm | 2000mm | 3000mm | 4000mm | ||||
Width(mm) | 210mm | 240mm | 300mm | 420mm | 480mmm/500mm | ||||
Height(mm) | 38mm | 45mm | 50mm | ||||||
Thickness(mm) | 1.0mm | 1.1mm | 1.2mm | 1.5mm | 1.8mm/2.0mm | ||||
Material | Q195-Q235 | ||||||||
Shape(Rib) | General Rib/V Stiffener /Square Stiffener | ||||||||
Good Market | Singapore ,Malyasia ,Middle East and Southeast Asia and all over the world | ||||||||
Cerification | ISO9001:2008 SGS etc | ||||||||
Surface Finishing | pre-galvanized (Zinc Coated :60g/ square meter) | ||||||||
Technique | automatic productive assembly line | ||||||||
MOQ(Minimum Order Quantity) | 500pcs | ||||||||
Payment | L/C at sight ;T/T 30% deposit | ||||||||
Package | packed in bulk or in bundle. shipped by container or as client's request | ||||||||
Production Capacity | 100000pcs/month |
Applications of scaffolding planks in construction: | ||||||
1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building. | ||||||
2.Stamping holes are on the scaffolding plank to resist skidding for workers. | ||||||
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and most environment. | ||||||
4. Various size of scaffolding plank could be customed. |
Advantage of scaffolding planks used for construction: | ||||||
1.durable & stable | ||||||
2.good bearing capacity | ||||||
3.low cost, high quality | ||||||
4.Excellent security function | ||||||
5.easy to assemble & dismantle | ||||||
6.long durability, the working life can up to 5-8 years | ||||||
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |