Enquiries
Message
Home > Products > Measurement & Analysis Instruments > Electrical Instruments > Battery Testers
Three phase four wire prepaid energy meter with free control software
  • Three phase four wire prepaid energy meter with free control software

Three phase four wire prepaid energy meter with free control software

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Textile Clothing Co.LTD
Meo Textile Clothing Co.LTD
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
shanghai,ningbo
Accepted Delivery Terms
Employees
101-200 people
Accepted Payment Currency
USD,CNY
Average Lead Time
60 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Place of Origin:
China
Brand Name:
HUTAI
Model Number:
DTSY844
Display Type:
Digital Only
Phase:
Three Phase
Measuring Energy Range:
0-99999
Accuracy Class:
1
Output Voltage:
220V/380V
Operating Temperature:
-25 ~+55
Product name:
3-Phase Active Power Meter
Frequency:
50HZ/60HZ
Display:
7 Digits LCD
Color:
White
Basic current:
1.5(10)A 3(6)A 5(20)A 10(40)A 15(60)A 20(80)A 30(100)A
Packaging & Delivery
Product Description
Model
Accuracy
Reference voltage Un
Rated current Ib
Access method



DTSY844




Class 1



3×220/380V/3×380V
1.5(6)A
Mutual inductance
5(20)A
Direct type
10(40)A
Direct type
15(60)A
Direct type
20(80)A
Direct type
Three phase four wire prepaid energy meter with free control software from China supplier

Three phase modbus prepaid energy meter DTSY844

DTSY844 electronic three-phase four-wire prepaid energy meter complies with the standards of GB/T17215.321-2008 andGB/T18460.3-2001. It uses advanced SCM processing system to collect, process and save data. Its purpose is to measure three-phaseAC active energy with a rated frequency of 50Hz or 60Hz.
Main features:
The application of computer management,
1.After the purchase of electricity.
2.After the use of electricity.
In the rated current range can limit the maximum use of power; a table one-card, electrical card can transfer data in both direction; automatic power off alarm users purchase electricity; electricity is zero , automatic power off; and has a certain anti-electricity software design.The meter is suitable for ambient temperature of -25°C~+55°C and relative humidity of no more than 85%.

Installation and use

1. The meter is inspected at the factory and printed in sealed form. It can be installed and used. If it is not sealed or stored
for a long time, the meter should be rechecked and sealed by the relevant department before installation.
2. The meter should be installed vertically and without tilting in a dry and ventilated place. The floor on which the meter is installed should be fixed on a wall that is strong and fire resistant and not easily vibrating. The height of the meter is about 1.8m.
3. Wire the wiring diagram, tighten the wiring screw, and fasten the connection box inside the terminal box.
4. After the meter has been connected to the meter, the number of the meter must be multiplied by the transformation ratio, which is the actual number of energy.
5. One-table multi-card: The IC card held by the user should be purchased at the power supply department/the electricity sales office once it is lost.
6. Power purchase method: When selling power, insert the IC card into the IC card reader/writer, operate the computer at the same time, and write the user's number, pre-purchased power, etc. into the IC card.
7. Use of electricity cards: Insert the electricity purchase card into the card holder. If it is a valid card, the electricity meter will read the data into the table for about ten seconds. The LCD display screen will display in order: the number of electricity meters and the remaining electricity.
8. Operation display: During the operation of the meter, the LCD screen alternately displays the remaining power and total power consumption in the watch. The running meter IC card must be inserted in the meter's card holder, otherwise the meter relay will not pull in and the meter will not output, and the user cannot use electricity normally. After the user runs out of electricity, the IC card should be pulled out and stored properly
9. Power failure warning: When the remaining power is zero, the power meter will turn off the power failure warning and display the “trigger” prompt. At this time, the IC card will go to the power supply department to purchase power. After the power is purchased, the IC card is inserted into the card socket. On the restoration of power supply.
Specification
Load current value
Power Factor (COSφ)
Basic error(%)
Directly connected to the instrument
Transformer instrument
1
2
0.05Ib≤I<0.1Ib
0.02Ib≤I<0.05Ib
1.0
±1.5
±2.5
0.1Ib≤I≤Imax
0.05Ib≤I≤Imax
1.0
±1.0
±2.0
0.1Ib≤I<0.2Ib
0.05Ib≤I<0.1Ib
0.5(Perceptual) 0.8(Capacitive)
±1.5
±2.5
0.2Ib≤I≤Imax
0.1Ib≤I≤Imax
0.5(Perceptual) 0.8(Capacitive)
±1.0
±2.0
Starting current
0.5%Ib
Rated frequency
50Hz or 60 Hz
Packing & Delivery
Packaging Details
6 pcs per carton
Port
Ningbo Yiwu
Non-customized
Customized
Quantity(Pieces)
1 - 20
21 - 500
>500
To be negotiated
Est. Time(days)
15
25
To be negotiated
To be negotiated
Three phase four wire prepaid energy meter with free control software from China supplier
Company Profile
Three phase four wire prepaid energy meter with free control software from China supplier

Wenzhou Shishu Electric - "Integrity Create Trust, Quality Builds Brand"

Wenzhou Shishu Electric Company is one of the main business units of Shanghai Hualian. Mainly engaged in the development of foreign trade sales channels and the development of foreign trade platforms.

At present, the company has just been established, but its main company, Shanghai Hualian, has many years of development experience in the domestic market. With its complete e-commerce and offline platforms, Hualian has achieved an average monthly shipment of tens of thousands of electricity meters, with an annual output value exceeding Tens of millions.

At present, the company has developed into a professional instrument R&D and production enterprise with an area of 6,569 square meters and hundreds of employees, and has a complete management system, implements pre-sales, in-sales and after-sales services , and provides customers with excellent product quality.

Advanced product technology, efficient customer service and strict testing standards have always been the standards established by Wenzhou Shishu and the Shanghai Hualian brand. We guarantee that each meter goes through multiple processes before leaving the factory, and then passes the three levels of enterprise self-inspection for precise debugging and random inspection.Really make customers feel relieved, happy and satisfied.

“Integrity Create Trust, Quality Builds Brand”, Wenzhou Shishu looks forward to cooperating with you
Product Knowledge

What is 3 phase electric meter?

The meter which is used for measuring the power of three phase supply is known as the three phase energy meter. The three phase meter is constructed by connecting the two single phase meter through the shaft. The total energy is the sum of the reading of both the elements.



Circuit Globe. 2021. What is Three Phase Energy Meter? - Definition, Working & Construction - Circuit Globe. [online] Available
at: [Accessed 5 August 2021].

What is the advantage of 3 phase over single phase

A polyphase system produces power at a constant rate in the load. A three phase system can transmit more power as compared to a single phase system. The efficiency of three phase operated devices and appliances is higher than the single phase operated machines. Three phase machines are less costly and more efficient.

ELECTRICAL TECHNOLOGY. 2021. Advantages of Three Phase Over Single Phase System. [online] Available at:
[Accessed 5 August 2021].
FAQ
Common Question
Answer
Can I add my logo on the products?
Yes, OEM and ODM are available for us.
How can I get the after-service?
1.We will send you the free spare parts if the problems caused by us. 
2.If the products cannot be repaired, we will send you new free quantity together with next order.
Do you have inspection procedures for products?
Our products 100% self-inspection and testing before packing.
Can I have a visit to your factory before the order?
Sure, welcome to visit our factory.
How about delivery time of the order?
15-20 days after getting deposit.
No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEric Zhang
Meo Textile Clothing Co.LTD
Enquire
Related Categories
CurrentMetersEnergyMetersOtherElectricalInstrumentsPotentiometersPowerMetersResistanceMeters
Popular Searches
flat cut lettersbattery vent capsanitary gasketscemetery planterswater doserglitter coastersbattery pentaxbattery heater fanaqua water heatershioki battery tester0 18v battery testerbattery regeneratorbattery 48d26rbattery scooterbattery led standoffbattery concealerglitter starsbattery for asusland battery testeralabaster coastersbattery refreshergantry systemstator testerbattery for tecnobattery ph meterbattery vas 5052battery heated vestbattery for uberbattery pigeonbattery for pajerobattery extenderartery forcepsbattery rebar cutterhammer casterwalter insertsbattery xenoev battery testeraster tonersscatter tubes urns2v battery load tester