Product Name | Meter box/distribution cabinet/control panel | ||||
Material | Carbon steel; Stainless steel; aluminum alloy; Brass alloy; copper; Zinc alloy ;SPCC SGCC SGLCC etc. | ||||
Description | The materials are fireproof, corrosion-proof, insulative and compression-resistant. Meter box can be fixed on the wall or installed on the electric pole. It is suitable for both electronic meters and mechanical meters, and users also can install switches, fuses and terminal boxes in the meter box. Distribution box is suitable for distribution control of modern buildings, such as large stores, guesthouse, stations, commercial net points, laboratories, factories and enterprises, used in AC 50-60Hz, below 500V illuminating and mini power controlling circuit as over current, overload and short circuit protection and frequency switch under the rated working state, 1 way to 45ways are available. | ||||
Size | Customed. Thickness:0.3mm-8.0mm.Tolerance:±0.01mm | ||||
Protection Level | As Customer's requirements. MAX: IP66 | ||||
Surface Treatment | Polishing, zinc plating, powder coating, e-coating, phosphated coating, Natural,Custom etc. | ||||
Certification | ISO 9002;ISO1400;CCC,CE,SGS,CAL,CMA | ||||
Drawing Form | CAD, PDF ,3D drawing |
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent, pls call us or tell us in your email so that we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under USD15), as long as you afford the express freight.
3) How long can I expect to get the sample?
After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 3-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.
4) What about the leading time for mass production?
Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.