(1) non woven bag Strength of bag capacity is 20KG
(2) non woven bag making machine Production per day is 50pcs/min*60/hour*12/day=36000pcs/day
(3) One person operate non woven bag making machine,one person pack bags.
(4) One non woven bag making machine complete make bag using non-woven fabric jumbo roll automatically,no need extra machine and
process.
(5)Cost of box non woven bag is much more lower than nonwoven sewing bag and paper bag regarding the high production
capacity,low cost of labor,and less process.
Model:Innovation 500 | |||
Bag Size(Gusset) | 7-20cm | Bag Size(Width) | 23-50cm |
Bag Size(Height) | 20-45cm | Bag Size(Loop handle range) | 36-54cm |
Production Speed | 35-55pcs/min | Applicable material(laminated non woven fabric) | 65-150gsms |
Applicable materials(non-woven fabric) | 65-150gsm | Replacing mold time | 30-45mins |
Power supply | 380v,50hz,3phase | Dimension | 10*2*2.6m |
Air supply | 1.2cumbic meter/min,100mpa | Total working space required | 12*3*3.5m |
Total Power | 28kw | Total Weight | 9MT |
1.Does this machine can make other types of bag?Like d-cUTbag(flatbed),u-cut bag(T-shirt),hanlde bag,shoe bag?
Sorry,this model can only make Box Bag,for above bag you can search on our webiste model TRBM-XB700.it can make 5 types of bag d-cUTbag(flatbed),u-cut bag(T-shirt),hanlde bag,shoe bag and box bag.
2.How can I get bag sample to check your quality?
We have free sample available for all dear customers,you just have to pay the cost of freight or air courier.If you place order to us,we can deduct the cost from the total order amount.
3.If I don't know how to operate,how can I get installation and training?
We have an experienced service group,our engineer can go to your factory to give installation and training approx.2 weeks.And all free of charge.You just provide our engineer accommodation.
4.If there is any problem on machine,how can I solve it?
First of all,we have online service,after submitting and problem we will come up with solution,if you can solve it yourself we will give you procedure step by step teach you solve it,by msg,pic,voice,or video talk.Normally we are good at video talk,and it is most successful method.If any electronic parts in problem which is occured itself(not improper operation),within one year warranty we will send new parts for replacement.You just cover the cost of frieght or air lift.
5.What's the lead time and lead term?
Leading time is one month after rceipt of 30%deposit,balance paid before delivery.