Description | Copper pipe, copper tubing |
Standard | ASTMB280,JIS H3300,AS/NZS1571.JIS3300-2006 |
Material | C21000,C22000,C22600,C23000,C24000,C26000,C26130,C26800,C27000,C27200, C27400,C2800,H59,H62,H70,H65,H80,H90,CuZn30,CuZn37,CuZn35,CuZn40,C31400, C31600,C32000,C33000,C33200,C33500,C34000,C34200,C34500,C35000,C35300, C35600,C36000,C36500,C37000,C37700,C38000,C38500,C40500,C40800,C41100, C42200,C44400,C48200,C46400,C46200,C60600,C62300,C62400,C63000,C63200, C64200,C71000,C71500,C70400,C70600,C70250,C70260,C71520,C72200,C74500, C75200,C77400,etc. |
Size | Wall thickness: 0.2mm~120mm Outside Diameter: 2mm~910mm Length: 1m, 2m, 3m, 6m, or as required. |
Packing: | -Each tube in a plastic bag with size label outside and pack in small -bundles or according to different request. |
MOQ: | -Each size one ton, LCL cargo is available. |
Delivery time: | -7-10 days for one FCL or according to order list detail. |
Payment: | -T/T or L/C. |
Note: | We can accept the third inspection. |