No. |
Item |
|
1. |
Processing Material |
GI,PPGI |
2. |
Processing Thickness(mm) |
0.2--0.35 |
3. |
Material of Rollers |
Cr12 steel,with hard treatment 58--62 |
4. |
Diameter of Shaft |
Φ50mm |
5. |
Production Speed |
20--25m/min |
6. |
Roller Driven |
Gear Transmission |
7. |
Cutting Model |
Hydraulic Profile Cutting |
8. |
Length Measurement |
Encoder |
9. |
Control Style |
PLC |
10. |
Operation Model |
Button + Touch Screen |
11. |
Total Power |
4+3kw |
12. |
Voltage |
380V 50HZ or at buyer's request |
13. |
Number of roller stations |
16 |
Model: Main tee:32×24×0.3
Cross tee:26×24×0.3
Processing flow chart
Manual Decoiler---Entry Beach---Roll Forming Machine---Automatic Shearing Mechanism---Computer Control Cabinet---Run-out Tables
Packing method:Bare covered, with waterproof cloth. Imported computer control system packed with waterproof cloth and card board.
Sales term:30% deposit by T/T before production, and the rest 70% should be balanced by T/T before loading into container and delivery.
Aftersales service:Seller is in charge to train the Buyer's worker, buyer sends worker to come to learn machine installation and operation in China factory. After inspecting successfully, machine will be installed by buyer's workers in buyer's factory. If there is running problem, which needs seller technician to debug. Seller will be in charge the visa, round-trip ticket, accommodation, three meals one day, as well as USD100 per day as allowance for seller technician. Buyer will supply all necessary tools and material sheets, as well as translator during debugging time. Buyer must keep the safe for seller technician in abroad.
Delivery time:50 working days after receive the advance payment.
Send Inquiry Now |