1 | Greenhouse Type | Venlo |
2 | Cover Material | PC Plate |
3 | PC Plate Thickness | 8mm |
4 | Span | 8m/9.6m/10.8m/12m |
5 | Structure Material | Hot-dip Galvanized steel pipe |
6 | Column Space | 4m/8m |
7 | Covering Material Service Time | >10years |
High output | Hydroponic system vegetables directly provide nutrition and water to the root through nutrient solution.The yield of vegetables grown in this way is several times higher than that of traditional soil cultivation |
Good quality | Because the nutrient supply is balanced, and it is carried out under the conditions of protective facilities such as greenhouses. the plant will not accumulate too much secondary metabolites produced by resisting drought, flooding, disease, insect bites, and nutritional imbalance. Therefore, the taste of hydroponic vegetables is better and the inner quality is better. |
Easy to automate management | its nutrient level can be accurately controlled by automatic control equipment. It is only necessary to add various detection probes and corresponding control equipment to realize the automatic management of the production process. |
Safe and delicious | Hydroponics pollution-free vegetables are natural, no additives, no residual pesticides and synthetic fertilizers, and no hormones are used. Any hydroponic vegetable tastes more flavorful, crisper and more delicious. |
1.How long is the delivery time? |
According to your greenhouse size and system, the delivery time is usually 10-60days. |
2.How long is the warranty period? |
Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year,sunshade net 2-3years, etc. |
3.Is your company foreign trade company or manufacturer? |
we are manufacturer. |
4.Can you supply sample? |
Small parts can be supplied,but you should pay the express. |
5.Can your company supply greenhouse design? |
Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract. |
6. How to install greenhouse? |
First we prepare the material and export.After your customs clearing, we send 2-4 engineers or all workers to guide to install.If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you. |
7.When installing, what cost should we pay? |
Our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication. |
8.What is the payment terms? |
Usually the deposit is 30%-50% of total value. Before loading, all the balance should be paid off. Or you can give your own payment terms, then we can negotiate it. |