Product Parameters |
The stranded earthing grounding cable is used as flexible connector in electric transmission and distribution appliance (such as volt transformer,electric stove),electronic equipment and thyristor. we will provide more attractive pure copper stranded cable price .
Technical Information
Conductor Material: | Copper, BS EN 60228:2005 | |
Conductor Shape: | Stranded Circular | |
Halogen Free: | Yes | |
Lead Free: | Yes | |
Rated Voltage Uo/U (Um): | 600/1000V | |
Minimum Installation Temperature: | Minimum: Maximum: | 0°C 60°C |
Minimum Operating Temperature: | Minimum: Maximum: | -15°C 70°C |
Short-circuit Maximum Conductor Temperature: | 250°C | |
Installation Type: | Earthing/circuit grounding | |
Flame Retardant: | IEC60332-1 | |
Bending Radius: | 1.5mm² up to 25mm² = 3 x Ø | |
35mm² up to 400mm² = 6 x Ø |
Feature of Product:
1. Unique manufacturing process: cold drawing process, no out of line,no warping, no cracking . |
2. Good corrosion resistance,the using life are more than 30 years. |
3. The surface is made of copper material, better electrical conductivity and much lower resistance than the conventional matertials. |
4.It is suitable for different soil moisture, temperature, PH value and under the condition with the resistivity changing ground construction. |
5. Safe and reliable connection. |
6. Convenient installation,improve the ground depth, special transmission party into the 35 meters underground, to meet the special occasions of low resistance requirements. |
7. Lower construction cost. |
Product Classification |
About Us |
Why Chooes Us |
Transaction Flow |
FAQ |
Question | Answer |
1. Are you factory or trader? | We are professional manufacturing factory |
2. How to order? |
Normally the customer can order our products by Alibaba platform or contact our representative by Email. |
3. Do you accept OEM manufacture? |
Yes. |
4. What's your lead time? |
Generally,the lead time is about 20 days after getting your down payment,the real time depends on your |
5. what's your payment Term? |
Generally, 30% down payment and the remained should be effected before shipping. |
6.Where is your nearest port? |
Ningbo or shanghai, both of them are about 3 hours ride. |