Item | Description | ||||
Size | The size is customized, it depends on the customer's needs. | ||||
Wall Panel | 150mm thick heat-resisting rock wool steel board,including: Outside panel is insulated galvanized sheet boards Inside panel is insulated galvanized sheet plate Keep heat, save energy and high curing efficient | ||||
Entrance Door | Entrance door,insulated heat-resisting 100mm rock wool steel board Handiwork metal plate 2-door for work pieces in and out. Be equipped doorknob | ||||
Heat Air Circulating Fan | Supply the enough air for the circulations of the oven to make sure the heat circulating and save energy. | ||||
Heating System | LPG/Diesel Heating System; LPG/Diesel burner, stainless steel heating exchanger, argon arc welding; Temperature:200-220°C ,heating time: 25-30 min, | ||||
Air Duct | Air duct with insulation rock wool layer, preventing heat lost and saving energy | ||||
Electrical Control System | Control panel is outside of oven to control temp and other functions; Temperature alarm(With inductor in the oven) ,stop button, process setting system:could set baking time and temperature, when baking time arrive, stop automatically | ||||
Power | The power is customized, according to the customer's city power. | ||||
Certificate | CE, ISO 9001 | ||||
MOQ | 1 set | ||||
Warraty | 12 months |
Riello burner allows optimal performance ensuring good combustion and reducing fuel consumption.
High temperature fan supplies the needed circulation and make sure the best powder curing effect.
Yantai Colin Coating Equipment Co., Ltd is a professional environmental quipment manufacture,the company products varied coating quipments like powder coating machine, powder coating booth, powder coating oven,powder reciprocator,powder coating production line,cyclone recovery systerm,hot air drying oven, drying boxes and drying tunnel,hanging conveyor,automatic spray pre-treatment etc.
Packing and Shipping | ||
Containers Needed | Our egineers will calculate how many containers will need according to the confirmed order. | |
Packing Details | 1. Plastic foam paper + hard papers covered to make sure the perfect conditions of the equipment during the delivery and shipping; 2. Every parts will be labeled with name, dimensions, number, etc for clients easier checks when receive the goods; | |
Q1. What is your terms of packing?
A: Generally, we pack our goods in separate parts and load into the containers.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW.
Q4. How about your delivery time?
A: Generally, it will take 35 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Will you test all equipments before delivery?
A:Yes, we will assemble and test for you before delievery and will send you the videos and photos.
Q6.Can you install for us?
A: Yes, if you want us to install for you, we can send experienced engineers to go overseas to install for you.