Features
1. The lifting method is chain lifting, which can be designed as two or three layers.
2. The vehicle enters and exits from the ground floor. The parking spaces on the ground floor are only traversed, and the top parking spaces are only lifted and lowered to complete the access movement.
3. Generally, the ground 3 trains are designed as a group, referred to as the 3+2 structure, that is, 2 parking spaces are added to the original 3 parking spaces. If the size of the site is allowed, several groups can be designed as one control zone. Each group of control zones needs to leave a horizontal vacancy. The number of vehicles in each control zone is generally no more than 20, and each control zone is designed with a control system.
4. The design structure is a four-column frame structure, which is stable and reliable. It only needs 20cm concrete floor and chemical anchor bolts are fixed, no special treatment is needed.
5, design multiple safety protection devices to ensure the safety of people, vehicles and equipment