Simulation Fake Artificial Leaves Leaf Vertical Injection Molding Making Machine
2. Parameter of artificial leaf vertical injection molding machine
Model | Unit | JY-450ST | JY-550ST | JY-850ST | ||||||
Screw Barrel Diameter | mm | 30 | 32 | 35 | 32 | 35 | 42 | 42 | 45 | 48 |
Injection Pressure | kg/cm2 | 1171 | 996 | 820 | 1642 | 1385 | 960 | 1027 | 895 | 790 |
Max. Shot Weight | gram | 89 | 101 | 127 | 122 | 148 | 211 | 211 | 241 | 272 |
Max. Shot Weight | cm3/sec | 62.5 | 71 | 95 | 49 | 59 | 84 | 99 | 113 | 129 |
Screw Barrel Route | mm | 115 | 140 | 140 | ||||||
Screw Barrel Rotary Speed | rpm | 0-190 | 0-175 | 0-200 | ||||||
Nozzle Contact Force | tons | 4.45 | 5.5 | 6.5 | ||||||
Nozzle Retraction Nozzle | mm | 190 | 210 | 210 | ||||||
Number of Temperature Control | pcs | 3 | 3 | 4 | ||||||
Clamping Force | tons | 45 | 55 | 85 | ||||||
Platen Size | mm | 580*430 | 670*480 | 740*545 | ||||||
Distance Between Tie Bere | mm | 410*250 | 470*280 | 525*325 | ||||||
Min. Mold Height | mm | 220/70 | 270/70 | 430/230 | ||||||
Opening Stroke | mm | 200 | 200 | 255 | ||||||
Max. Opening Mold Distance | mm | 420/270 | 470/270 | 685/485 | ||||||
Ejetor Force | tons | 1.76 | 1.76 | 2.1 | ||||||
Ejetor Stoke | mm | 35 | 35 | 45 | ||||||
Max. Hydraulic Pressure | kg/cm2 | 140 | 140 | 140 | ||||||
Pump Output | L/min | 37.2 | 40 | 47 | ||||||
Oil Resservoir Capacity | Liter | 130 | 150 | 180 | ||||||
Cooling Water Consumption | L/hr | 600-800 | 800-1000 | 800-1000 | ||||||
Pump Motor Power | kw/hp | 5.5/7.5HP | 7.5/10HP | 11/15HP | ||||||
Barrel Heating Power | kw | 2.8 | 4.5 | 5 | ||||||
Total Power | kw | 9 | 12 | 16 | ||||||
Machine Weight | tons | 1.8 | 3 | 5 | ||||||
Machine Dimension(LxWxH) | meter | 1.7*1.2*3 | 1.85*1.2*3 | 2*1.3*3.2 | ||||||
Shipping Weight | tons | 2 | 3.4 | 5.4 | ||||||
Shipping Measurements(LxWxH) | meter | 1.92*1.3*2.3 | 2.1*1.4*2.3 | 2.2*1.4*2.5 |
3. Detailed Image
4. Our Company:
Dongguan Jieyang Machinery Co., Ltd is established in 2010, which is located in Xincheng Industrial Zone of Hengli Town. Our factory is about 2000 square meters. We have more than 20 years manufacturing experiences of vertical plastic injection molding machines with precision machining equipment and professional team. We do our best to provide the solution with competitive cost to our customers and it is recognized by all our customers.
We warmly welcome you to visit our factory, we are waiting for you at JieYang!
Our Goal: "Customer Satisfaction, Continual Improvement and Innovative Service" is the driving force for our company to moving forwards. We will devote every efforts to do our best level.
5. Application:
You can choose from the most extensive range of machines available in the industry, from the comprehensive spectrum of automated machine concepts to customer-specific special solutions. Vertical injection machine have the advantage of low noise, low energy consumption,high efficiency and long life time, it's widely apply to produce various terminal blocks, household appliances, consumer electronics, power tools, automotive dashboards, medical devices, open containers, connectors, cables,auto parts, Plug ,etc.
6. Certifications:
7. Packing & Shipping:
1. Before shippment,we will check and test the machine carefully.
2. We will start to manufacture the machine the day after your confirmation, and the machine will be shipped within 25 working days.
3. We will select the best forwarder according to the country the machine will be shipped; Besides, you can choose your own forwarder, and we will send the machine to your designated warehouse.
8. FAQ:
Q1: Are you a trading company or a manufacturer? |
A1: Factory we are, all the machine are made by ourselves. Besides, you can get the customize service with your requirements |
Q2: What's your warranty for the machine? |
A2: One Year Warranty(all the machine parts can be replaced within one year free of charge, not including the manmade broke), life-time maintenance. |
Q3: What's your Delivery Time? |
A3: Usually it is 3-5 days if the machine is in stock; If not, the delivery time is 10-25 days according to your required quantity and our busy season. |
Q4: Where is your factory? How can visit you? |
A4: Our factory is next to Guangzhou and Shenzhen. We will drive you to our factory by car when you arrive at Dongguan or Changping Railway(Bus) station. |
Q5: Why choose Jieyang Machinery Co., Ltd.? |
A5: "Customer Satisfaction, Continual Improvement & Innovative Service" are the driving force for our company to moving forwards. We will devote every efforts to do the best level machine and service. |