Working principle
When the flotation machine works, the motor drives the impeller to revolve, so the centrifugal effect and negative pressure are produced. On one hand, ample air is absorbed and mixed with mineral slurry, on the other hand, the mixed mineral slurry is mingled with additive, meanwhile, the foams are thinning, the mineral is bounded with foams, and floats up to the surface of mineral slurry and the mineralized foam is formed. The liquid surface can be adjusted with the height of adjustment flashboard, so that the useful foams are scraped with squeegee.Model | SF0.37 | SF0.7 | SF1.2 | SF2.8 | SF4 | |
Volume (m³) | 0.37 | 0.7 | 1.2 | 2.8 | 4 | |
Impeller diameter(mm) | 300 | 350 | 450 | 550 | 650 | |
Capacity (m³/min) | 0.2-0.4 | 0.3-0.9 | 0.6-1.2 | 1.5-3.5 | 0.5-4 | |
Impeller Speed(r/min) | 352 | 400 | 312 | 268 | 238 | |
Impeller motor | Model | Y90L-4 | Y100L2-4 | Y132M2-6 | Y160L-6 | Y180L-6 |
Power (Kw) | 1.5 | 3 | 5.5 | 11 | 15 | |
Scraper motor | Model | Y90S-4 | Y90L-4 | |||
Power (Kw) | 1.1 | 1.5 |
Features
1.Simple structure, strong agitation ability, and low energy consumption.
2.The impeller is equipped with holey cylinder air alloter.
3.The air scattering is uniform and the mixing effect of air and slurry is good.
4.U-shaped tank, little sedimentation of sand.
5.Solid particles can be fully suspended, high flotation index.
6.Long service life of vulnerable parts.
6 Types of Gold Ore
Gold exists in quartzite. Usually, quartz appears as small stones in large cracks in riverbeds or mountain slopes and has crystals in different colors such as white, yellow, pink, purple, gray, or black. The most common types of quartz with gold ore are rose quartz gold ore and rainbow gold ore. A high gold-quartz ore contains 25% gold by mass, and it occurs in areas where the bedrock is fractured by tectonic and volcanic activity.Flow chart of gold ore processing
Placer gold ore with high gold content mostly exists in the form of particles. Therefore, the ideal method to process placer gold ore is gravity separation.
1. Are you manufacture or trading company?
We are factory, established in 2003.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
30% deposit in T/T advance, 70% balance before shipment.
4. How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at lowest cost.
5. If I need the complete crushing plant can you help us to build it?
Yes, we can help you set up a complete production line and give you related professional advice. We had already build many mining projects in China & Overseas.