Changchai 102HP Engine, Big Tank with 360 Unloading Pipe, Cutting Width 2.2M, Rubber Track550*90*56,45cc HST, 85 Gear Box, New Reel wheel, Cabin with A/C
Feartures:
1. Adopts 102HP engine with high power and low fuel consumption.
2.Cutting Width 2.2m or 2.36m for different areas of fields.
3. WORLD special hydraulic gearbox 85 with best quality.
4.Use 45cc HST for working more smoothly.
5.Bigger threshing cylinder ensures grain lose less and much cleaner.
6.Stronger rubber track 550*90*56 with high teeth for working more efficient in deep mud field.
7.Cabin With A/C
COMBINE HARVESTER | ||||
Technical Parameter | ||||
Model | RUILONG 4LZ-6.0P | |||
Type | Self-propelled Whole-feeding | |||
Dimension (Operation) | Length(mm) | 6200 | ||
Width(mm) | 3020 | |||
Height(mm) | 3080 | |||
Weight(kg) | 3500 | |||
Engine | Type | 4G33V16 | ||
Power(HP) | 102 | |||
RPM(r/min) | 2600 | |||
Fuel Capacity(L) | 130 | |||
Gearbox | Hydraulic Gearbox Box ZKB85 | |||
HST | 45cc | |||
Chassis | Track(mm) | 550*90*56 | ||
Track Gauge(mm) | 1250 | |||
Ground Clearance(mm) | 350 | |||
Harvesting | Cutting Width(mm) | 2200 | ||
Feeding Capacity (kg/s) | 6.0 | |||
Cutting Bar Lift | Hydraulic Control | |||
Threshing | Type | Axial Flow Type with Beat Bars | ||
Threshing Cylinder (mm) | 700*2360 | |||
Filtrate Type | Vibrating Sieves+ Centrifugal Fan | |||
Discharging | Grain Tank Capacity(M3) | 1.6 | ||
Grain Discharge Type | All Direction Discharging Pipe | |||
Work efficiency(ha./h) | 1.2-1.8 | |||
Crops | Rice, Wheat, Rape,Soybean,Corn |
SHIPPING(Normally arrive port time in working days) | ||||
Destination | Express/Courier | Ship by sea | Ship by air | Ship by EMS |
DHL/FedEx/UPS/SF | ||||
North America | 3-7 days | 15-24 days | 5-7 days | 10-12 days |
South America | 3-7 days | 15-25 days | 5-7 days | 10-12 days |
European Countries | 3-7 days | 20-30 days | 5-7 days | 10-12 days |
Africa Countries | 3-7 days | 40-50 days | 5-7 days | 10-12 days |
The Middle East | 3-7 days | 15-25 days | 5-7 days | 10-12 days |
Australia | 3-7 days | 10-15 days | 5-7 days | 10-12 days |
Q1. What is your terms of packing?
A: Generally, we pack our goods in our W brand box ..
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, most of items we keep stock for all season . it will take 7to 10 days after receiving your advance payment. .if we didn’t have stock ,The delivery time depends on the items and the quantity of your order. Normaly 30 to 60days .
Q5. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q6. Do you inspect all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
1.Meet small quantity orders and seasonal orders by our sufficient safety stock;
2.Assure best quality with our complete inspection system before shipment
3.Ensure timely delivery to customer’s designated site by our professional management of warehouse and van fleet;
4.Provide in time Feedback tracking and after-sales services to maximize the customer’s satisfactory.